Skip to main content

Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project

Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen
April 18, 2017 Read time: 2 mins
Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project.

The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review.

In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investment JSC.

The 705m bridge connecting the city’s districts 2 and 7 is expected to have a vertical clearance of 45m above the Saigon River, similar to that of the cable-stayed Phú Mỹ Bridge, opened after two years of construction in 2009.

The six-lane Phu My Bridge was built by a consortium consisting of Baulderstone, Bilfinger Berger, 1388 Freyssinet International and the Vietnamese concrete and formwork company CC620. The bridge designer was the French consultant Arcadis and approach road designer was Cardno. Project manager was 1397 AECOM. The main span is 380m long and the bridge has a 27m-wide main span deck.

While the city is not located on the coast, bridges must still be high enough to allow passage of large ships navigating inland along the Saigon River, making bridges costly, the Ministry of Transport reportedly said.

The new bridge is part of a larger plan to make transport and shipping more efficient in Vietnams largest city by population and the country’s economic capital. Between 2020-2030, 11 ports and piers handling ships up to 30,000tonnes on the Saigòn River will be relocated. New road layouts will be constructed for the piers.

More than 10 million live in Ho Chi Minh’s metropolitan area.

For more information on companies in this article

Related Content

  • New transport links for Vietnam’s key cities
    May 31, 2019
    Both Ho Chi Minh City (HCMC) and Hanoi in Vietnam are to benefit from new transport infrastructure. For HCMC, as much as $39.6 billion will be required to deliver all of the 85 transport infrastructure projects being planned. Severe congestion and flooding are frequent problems causing major traffic hold-ups. Of the 85 transport projects needed for the city, 15 are for the construction of new roads while 55 are for road/bridge works. A further eight are for rail links and seven for waterways. Meanwhile in
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Vietnam’s expressway expansion programme
    February 23, 2022
    Vietnam’s expressway expansion programme is well underway.
  • Vietnam ponders PPP for Ring Road 4 work in Ho Chi Minh City area
    April 24, 2019
    A 36km segment of 197km Ring Road 4 project in the Long An Province could cost as much as US$300 million, according to a prefeasibility study. The segment runs from Ben Luc rural district to Hiep Phuoc Port in the Ho Chi Minh urban area, as noted in the study prepared by Cuu Long Corporation. The government is considering offering the work as a public-private partnership. The road would feature 10 bridges and an overpass at an intersection with National Highway 1. If approved, work could start i