Skip to main content

Highways expansion project in Los Angeles area

A loan worth US$629 million will help pay for a highway upgrade for the I-405 route in Orange County, California. The stretch of I-405 connects with Costa Mesa, on the southern side of Los Angeles. The federal loan is being provided by the US Department of Transportation to the Orange County Transportation Authority (OCTA). The work is to upgrade a 22.4km stretch of I-405 between its junction with the I-605 Interstate, close to Rossmoor, and the SR 73 route at Costa Mesa, which connects with the nearby John
August 9, 2017 Read time: 2 mins

A loan worth US$629 million will help pay for a highway upgrade for the I-405 route in Orange County, California. The stretch of I-405 connects with Costa Mesa, on the southern side of Los Angeles. The federal loan is being provided by the 2364 US Department of Transportation to the 3300 Orange County Transportation Authority (OCTA). The work is to upgrade a 22.4km stretch of I-405 between its junction with the I-605 Interstate, close to Rossmoor, and the SR 73 route at Costa Mesa, which connects with the nearby John Wayne Airport. In all this highway upgrade project is expected to cost $1.9 billion, with work scheduled to commence in 2018 and finish in 2023. The rest of the financing package for the project has yet to be announced. New lanes will be added in both directions, including express lanes that will be tolled except for vehicles with multiple occupants.

For more information on companies in this article

Related Content

  • Virginia tunnel and bridge expansion stage complete
    April 26, 2024
    A key stage of the Virginia tunnel and bridge project is stage complete.
  • FGinal stage of Florida project
    July 28, 2016
    Work is now commencing on the final stretch of the Wekiva Parkway, State Road 429, in Florida. This will be the fifth section of the parkway, with the work being managed by the Central Florida Expressway Authority (CFX). Section 2A will stretch 3.2km and the construction work expected to be complete in January 2018. This US$38.65 million project will be located north of Haas Road between Plymouth Sorrento Road and County Road 435 (Mount Plymouth Road). Section 2A will connect to Section 2B, the systems int
  • Construction commencing on Pennsylvania highway stretch
    November 16, 2018
    Construction is commencing on a 4.4km stretch of the Southern Beltway in the US state of Pennsylvania. This forms part of a project for a 21km section of toll road, with its completion expected in 2022. The entire project is for the extension of the Southern Beltway from the Turnpike 576 terminus at US Route 22 in Robinson Township, to a new interchange with Interstate 79 at the Allegheny-Washington County line. The work is needed to boost capacity and improve transport, while cutting congestion for drivers
  • Revamped US-Mexico border crossing
    September 7, 2022
    Revamping work is underway for the US-Mexico border crossing near San Diego.