Skip to main content

Highways England to upgrade Winchester M3 junction

Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester. Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout. The M3 is the main road between London and the Solent Ports or
July 5, 2019 Read time: 2 mins
Artist impression of how the resigned junction 9 of the M3 motorway in southern England will look when complete in 2023 (courtesy Highways England)
8100 Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester.


Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout.

The M3 is the main road between London and the Solent Ports or Portsmouth and Southampton. The A34 is the main corridor between the south coast and the English Midlands region. Around 110,000 vehicles use the junction every day, including over 5,500 trucks because of the port traffic.

The roundabout itself will be redesigned into a new so-called dumbbell layout, which will increase capacity, improve safety and make journey times more reliable, according to the government-owned company.

Work will include widening the M3 from two to four lanes between the south-facing roundabout slip roads and the new free-flow links with the A34. Subways will be built through the junction to create a continuous, segregated route for pedestrians and cyclists between the South Downs National Park and the towns of Winnall and Abbots Worthy.

The plans recently went on show with the consultations running until the end of August.

“More than 6,000 vehicles use this junction each hour during peak times and making the junction free flow will stop queues backing up onto the main carriageway and reduce the risk of collisions,” said Neil Andrew, Highways England senior project manager.

“Not only will the improvements help to separate local and long-distance traffic, we are also improving access for pedestrians, cyclists and equestrians [horse riders].”

For more information on companies in this article

Related Content

  • Tensar’s Glasstex makes the grade in UK’s Smart Motorway upgrade
    February 27, 2017
    A Stress Absorbing Membrane Interlayer is delivering stronger, safer and more reliable surfaces for the UK’s M3 Smart Motorways project in the southern England.
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • Flyover removal completed successfully
    May 14, 2021
    The removal of a flyover in Perry Barr, Birmingham, has now been completed in the UK. The work was carried out successfully by the contractor Tarmac within a tight timeframe