Skip to main content

Highways England to upgrade Winchester M3 junction

Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester. Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout. The M3 is the main road between London and the Solent Ports or
July 5, 2019 Read time: 2 mins
Artist impression of how the resigned junction 9 of the M3 motorway in southern England will look when complete in 2023 (courtesy Highways England)
8100 Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester.


Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout.

The M3 is the main road between London and the Solent Ports or Portsmouth and Southampton. The A34 is the main corridor between the south coast and the English Midlands region. Around 110,000 vehicles use the junction every day, including over 5,500 trucks because of the port traffic.

The roundabout itself will be redesigned into a new so-called dumbbell layout, which will increase capacity, improve safety and make journey times more reliable, according to the government-owned company.

Work will include widening the M3 from two to four lanes between the south-facing roundabout slip roads and the new free-flow links with the A34. Subways will be built through the junction to create a continuous, segregated route for pedestrians and cyclists between the South Downs National Park and the towns of Winnall and Abbots Worthy.

The plans recently went on show with the consultations running until the end of August.

“More than 6,000 vehicles use this junction each hour during peak times and making the junction free flow will stop queues backing up onto the main carriageway and reduce the risk of collisions,” said Neil Andrew, Highways England senior project manager.

“Not only will the improvements help to separate local and long-distance traffic, we are also improving access for pedestrians, cyclists and equestrians [horse riders].”

For more information on companies in this article

Related Content

  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L
  • US$250 million Colorado construction contract commences
    June 26, 2024
    A US$250 million Colorado highway construction contract is now underway.
  • Mott MacDonald picks up Highways England’s operations centre deal
    March 28, 2018
    Mott MacDonald will set up an asset management system as part of Highways England’s new technology operations centre. Under the T-TOC contract - Tools for the Technology Operations Centre – Mott MacDonald will work with Fujitsu which will develop a suite of software systems to monitor and manage electronic assets across Highways England’s network. Highways England has nearly 100,000 intelligent infrastructure devices across England’s strategic road network – trunk roads and motorways. T-TOC will enable a
  • Vandals attack road fittings on key Nairobi road link
    April 24, 2013
    A wave of vandalism has hit a new superhighway from Nairobi as Shem Oirere reports. The newly opened 45km superhighway in Kenya’s capital Nairobi is facing a new challenge that threatens to erode its international standards and compromise the benefits it is meant to generate. A wave of vandalism targeting road fittings has hit the US$360 million highway linking Nairobi to Thika Town, posing a new challenge in the maintenance of the new road infrastructure in Kenya. The destruction delayed the completion of