Skip to main content

Highways England to upgrade Winchester M3 junction

Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester. Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout. The M3 is the main road between London and the Solent Ports or
July 5, 2019 Read time: 2 mins
Artist impression of how the resigned junction 9 of the M3 motorway in southern England will look when complete in 2023 (courtesy Highways England)
8100 Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester.


Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout.

The M3 is the main road between London and the Solent Ports or Portsmouth and Southampton. The A34 is the main corridor between the south coast and the English Midlands region. Around 110,000 vehicles use the junction every day, including over 5,500 trucks because of the port traffic.

The roundabout itself will be redesigned into a new so-called dumbbell layout, which will increase capacity, improve safety and make journey times more reliable, according to the government-owned company.

Work will include widening the M3 from two to four lanes between the south-facing roundabout slip roads and the new free-flow links with the A34. Subways will be built through the junction to create a continuous, segregated route for pedestrians and cyclists between the South Downs National Park and the towns of Winnall and Abbots Worthy.

The plans recently went on show with the consultations running until the end of August.

“More than 6,000 vehicles use this junction each hour during peak times and making the junction free flow will stop queues backing up onto the main carriageway and reduce the risk of collisions,” said Neil Andrew, Highways England senior project manager.

“Not only will the improvements help to separate local and long-distance traffic, we are also improving access for pedestrians, cyclists and equestrians [horse riders].”

For more information on companies in this article

Related Content

  • Highways England goes green with Mobilane Green Screens
    May 22, 2018
    Highways England has installed a “green bridge” as part of the US$242 million A556 Knutsford to Bowdon dual carriageway project. Mobilane Green Screens are part of the innovative new feature. The project to improve links between the M6 and M56 includes seven new bridges plus a pedestrian underpass along the 7.3km new road. Other work includes concrete retaining walls and repairs to two existing bridges. The new dual carriageway will make travelling between the M6, south Manchester and Manchester Airport q
  • UK gets its first wrong-way slip detection installation
    February 13, 2020
    Drivers mistakenly travelling in the wrong direction towards traffic exiting motorways and dual carriageways will be alerted using a pioneering warning system in Scotland.
  • Safer roads needed for the gig economy
    May 14, 2019
    Roads everywhere are becoming high-pressure workplaces for millions of gig economy workers, meaning traffic police need a new way to regulate how highways are used. Geoff Hadwick reports from Manchester, UK The way in which the world’s highways are designed, built and used needs to change fast as the gig economy becomes a global phenomenon. Millions of low-paid and badly-trained freelance drivers are now using road as their workplace, all of them working hard under huge amounts of pressure. The tren
  • HA dismantles footbridge over M5 in England
    January 3, 2013
    Contractors worked solidly throughout the night during one Saturday and early Sunday morning in November (2012) to dismantle the Pegwell Brake footbridge over the M5 near Bristol, south west England. The concrete footbridge, located between junctions 16 and 17, needed to be demolished to make way for a new steel pedestrian bridge suitable for high-sided vehicles to pass under when the managed motorway is fully operational and the hard shoulder is used as a running lane. The dismantling and removal of the