Skip to main content

Highway construction to be completed for South East Nigeria

Further financing will be required to complete construction work for Nigeria’s vital East-West highway project. Work is being carried out on sections of the highway between Warri and Port Harcourt and from Eket to Ikot Akan and Atan Ikpe. The former stretch is being handled by Setraco Nigeria, while the latter is being handled by Reynolds Construction Company. However a further US$277.4 million will be required to fund the work, which involves widening the highway so that it features two lanes in either dir
June 11, 2018 Read time: 2 mins
Further financing will be required to complete construction work for Nigeria’s vital East-West highway project. Work is being carried out on sections of the highway between Warri and Port Harcourt and from Eket to Ikot Akan and Atan Ikpe. The former stretch is being handled by Setraco Nigeria, while the latter is being handled by Reynolds Construction Company. However a further US$277.4 million will be required to fund the work, which involves widening the highway so that it features two lanes in either direction. In all the East-West highway runs 657km between Warri and Calabar and was originally expected to cost $2 billion. Passing through the Niger Delta area, the route crosses numerous rivers and creeks and will feature two larger box girder type bridges measuring 850m and 700m, as well as numerous smaller bridges.


The section of the highway between Ikot Akan and Port Harcourt passes Bonny Island, where many of the oil facilities are located, although the route runs inland. Transport between the island and Port Harcourt depends largely on water traffic, with helicopters also being used extensively for senior personnel. A bridge to Bonny Island has been proposed in the past, but has never managed to move ahead to actual construction.

It remains to be explained as to why the south east of Nigeria, the centre of the oil industry on which the country’s GDP has relied on for the last few decades, has suffered so badly in terms of road development. Better roads to and from the oil producing areas would help ensure the industry is fully competitive.

The Niger River Delta and surrounding areas have suffered from instability over the years, likely fuelled by resentment at the Nigerian Federal Government’s inability to provide adequate infrastructure over successive administrations, despite the region’s importance to the country’s GDP. However the present Nigerian Federal Government has recognised the need for infrastructure development, with the East-West highway being seen as a priority.

Related Content

  • South Eastern Nigeria highway link
    May 12, 2017
    A new highway link is planned for South Eastern Nigeria. The US$154.4 million project will connect Odukpani Itu in Cross River State with Ikot Ekpene in Akwa Ibome State. Approval for the project has been given by Nigeria’s Federal Executive Council (FEC). The link will provide a major new highway connection for Nigeria’s South Eastern region, improving transport between Calabar through to the rest of the country. This will provide a major economic boost to the Efik/Ibibio/Anang-speaking language group of N
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio
  • US$1.44 billion funding for Nigerian infrastructure
    June 6, 2024
    US$1.44 billion funding is being secured for Nigerian transport infrastructure works.
  • South East Nigeria’s new dual carriageway planned
    September 21, 2015
    A new dual carriageway is planned for Nigeria’s Cross River State, in the South East of the country. The dual carriageway will connect the city of Calabar in the south of the state with Obudu in the north of the state. The project has had its official ground breaking ceremony carried out by the country’s president, Muhammadu Buhari. The dual carriageway will stretch around 260km in all according to reports in the Nigerian press. This new dual carriageway will help cut journey times as the condition of the e