Skip to main content

Heijmans picks up motorway maintenance deal for Brabant

Dutch construction company Heijmans has been awarded a contract for the maintenance of motorways in Noord-Brabant province by the Dutch infrastructure and water board Rijkswaterstaat. The €13 million contract covers the A2, A50, A59 and A67 motorways including fly-overs and bridges. Work will start at the end of August. Heijmans has been involved in road building and maintenance since 1923. Last month, the company announced that effective 1 July, Bart Smolders will join as director of Heijmans Inf
May 7, 2019 Read time: 1 min
Bart Smolders: joining Heijmans from Siemen Mobility
Dutch construction company Heijmans has been awarded a contract for the maintenance of motorways in Noord-Brabant province by the Dutch infrastructure and water board Rijkswaterstaat.


The €13 million contract covers the A2, A50, A59 and A67 motorways including fly-overs and bridges. Work will start at the end of August.

Heijmans has been involved in road building and maintenance since 1923.

Last month, the company announced that effective 1 July, Bart Smolders will join as director of Heijmans Infra and on 1 December he will take over as chairman of the board, replacing Gerrit Witzel.

Heijmans said that Smolders, who is currently chief executive of Siemens Mobility, will focus on “strategic development of the infra activities relating to digitalisation and data-driven services”.

Related Content

  • Greater Manchester's smart motorway M60 now fully-operational
    August 6, 2018
    Drivers using the M60 in the greater Manchester area now using the region’s first smart motorway, according to Highways England. The technology, which went line on July 31 on the final M60 section, includes electronic signs to guide drivers along at a variable but steady speed. Other technology includes an extra running lane in each direction along the M62 between junction 18 and junction 20 and CCTV cameras. The removal of narrow lanes and completion of the project will allow key sections of the M60
  • French Q1 sales of equipment hit record levels
    May 22, 2019
    Sales of construction equipment in France are at the highest levels ever observed in the country, according to CISMA, the French trade association. In the first quarter of 2019 six new records were set. Compared with Q1 2018, the market is up 10%. This performance can be explained by the rise in sales to rental companies of nearly 13%, notes CISMA. The mobile elevating work platform sales reached a peak of 3,545 units in the quarter – highest ever, beating the previously best years of 2000-2001 an
  • A joint venture will carry out a key Netherlands transport project
    January 20, 2017
    A joint venture team is to carry out the key Zuidasdok project in the Netherlands. The Zuidplus joint venture team comprises the partners Fluor, Heijmans and Hochtief. The package of works includes widening the A10 South motorway, which includes an underground stretch, as well as the expansion of the Amsterdam Zuid station. The design and construction contract is worth approximately €990 million, of which Fluor has a 42.5% share, Heijmans 15% and Hochtief 42.5%. The contract also includes seven years of
  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra