Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • Poland place Via Carpatia on list of priorities
    July 18, 2017
    The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023. The government also increased the budget for building roads by €6.7 billion to €32.1 billion. The announcements are part of the National Road Construction Programme (PBDK).
  • Poland: tenders open for S19 in Podlasie
    March 13, 2020
    Poland has invited tenders for another stretch of its section of the Via Carpathia.
  • Riga's transport infrastructure system to get a boost from EU funding
    February 11, 2014
    The European Union will support with over €1.5 million from the TEN-T Programme a series of studies looking at the connection of the Freeport of Riga in Latvia to the TEN-T road network. The studies, selected under the 2012 TEN-T Annual Programme, specifically concern the detailed design needed ahead of the construction in 2016 of a 9.1km stretch (Segment 1) of the Riga Northern Transport Corridor (Northern Corridor). The Northern Corridor is an east-west motorway which will cross the old historic town ce
  • Poland’s A1 section Pyrzowice to Tuszyn clears another hurdle
    November 11, 2014
    The Polish province of Lodzkie has signed a territorial contract that will allow construction of the Pyrzowice to Tuszyn section of the national A1 motorway. Territorial contracts are agreements between the central and regional governments in order to allow investment in key projects, such as roads. Around 90 projects worth in total US$7.63 billion will benefit from the contract. Apart from the 140km A1 motorway section, projects include rail line upgrades, Wielun and Belchatow ring roads hospital extensio