Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • Road sector drives Europe’s construction recovery
    September 13, 2017
    Despite political concerns and upheavals, Europe’s construction market is on the up, reports Graham Anderson Europe’s road building market is forecast to grow strongly in real terms up to 2019, as a strengthening economy boosts construction, creating investment and jobs. The market is predicted to grow by 16% between 2016 and 2019 and is being led by increases in the UK (39%), Norway (38%) and Poland (35%). In the UK, the market is buoyed by a number of major projects coming on stream, such as England’
  • Instarmac’s Flowpoint fills in the spaces at Juuliku junction
    February 8, 2018
    UltraScape Flowpoint has been used at three new roundabouts as part of the €11 million Juuliku junction and section upgrade near Tallinn. The 9km project involved reconstructing areas of the road network as well as introducing a new 3.4km section of road, two bridges and viaducts and a two-level interchange. An additional three roundabouts were built with natural stone to assist with the flow of cars and trucks. Maanteeamet (the Estonian Road Administration) required a grout that would be durable and cou
  • Companies line up for Norway’s Rogfast project at Kvitsøy
    November 27, 2018
    Five companies have expressed an interest in the technically challenging €315 million Kvitsøy section of Norway’s major road and tunnel project Rogfast.
  • Another boost for Romania’s A3 Transylvania
    January 26, 2024
    The deal with the European Investment Bank is construction of a 42.3km section of the motorway between Nadaselu and Poarta Salajului.