Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • Czech contract issues
    March 1, 2012
    Work to the D3 highway connecting Czech capital Prague with Ceske Budejovice and the Austrian border is not seen as a key project that will be supported by the European Commission (EC) between 2014 and 2020.
  • Breakthrough on Slovakia’s D1 tunnel near Zilina
    December 12, 2016
    Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na
  • Strabag to build 24km section of Poland’s S6 for €83 million
    November 2, 2015
    Publically listed Strabag has won the design and build contract to build a 24km section of Poland’s S6 for €83 million. The S6 expressway links the largest cities in northern Poland, Szczecin and Gdańsk. The publicly listed construction group Strabag will design and build the section between Goleniów and Koszalin for about €83 million. Construction of the 24 km dual carriageway asphalt road with two lanes of traffic in each direction will start this month with a scheduled finish of June 2019. The cont
  • Four offers for Sibiu-Pitesti A1 motorway Lot 4 section
    September 4, 2019
    Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot