Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • France mulls widening the A31 between Nancy and Thionville
    December 20, 2018
    France is considering a 115km project to enlarge the A31 motorway between Nancy and Thionville near the border with Luxembourg. This project is expected to cost between €1.4-1.6 billion and work will be divided into three sections. The A31 autoroute, also known as l'Autoroute de Lorraine-Bourgogne, runs from the border with Luxembourg to Beaune where it joins the A6. It serves the cities of Metz, Nancy and Dijon and is heavily used in the holiday season as it is a convenient route for those travelling
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Austria-Slovenia tunnel project awarded
    August 9, 2018
    Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
  • Poland: tendering for Lodz's Western Ring-Road attracts 17 offers
    February 10, 2017
    The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi