Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Upgrading Poland's roads for UEFA 2012
    February 7, 2012
    POLAND has ambitious plans to construct around 900km of new highways in time for the European Football Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Czech D35 section deal for Mott MacDonald
    April 23, 2024
    PricewaterhouseCoopers, Mott MacDonald, White & Case and SIEBERT + TALAŠ are part of the winning consortium for the Mohelnice-Opatovec stretch.
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to