Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • Eurovia, Stavby and PORR win Prague D0
    November 19, 2024
    According to Czech media, the consortium offered the lowest price for the D0 section, €413.24 million - significantly less than the estimated €595 million.
  • Serbia inks two road deals with China at 16plus1 summit
    April 23, 2019
    Serbia said it signed two road construction agreements with China during the 16plus1 Summit in Dubrovnik, Croatia earlier this month. The two deals are for construction of the Pozega-Boljare and Novi Beograd-Surcin road routes. The Pozega-Boljare project alone is worth €2 billion and will be financed from the existing loan from the Exim Bank, according to media reports. China’s east-west Belt and Road Initiative was the focus of the annual 16plus1 Summit that brought together leaders from Beijing plus
  • Completion of Prague’s outer ring-road Běchovice section for 2024
    July 24, 2019
    Completion of Prague’s outer ring-road connecting the D1 motorway with Běchovice town to the north should be in 2024, a year earlier than planned. Czech prime minister Andrej Babiš made the announcement, saying the 2025 date set by the Czech Highway Authority was too far off, according to local media. The national Czech News Agency reported that the 12.5km section will cost around €365 million. Transport minister Vladimíra Kremlík said that the state will have to acquire land from up to 500 land ow
  • Polish tenders worth €4.6 billion to be announced in 2019
    January 11, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) will announce tenders worth around €4.64 billion for construction of around 435km of roads this year. Included will be 172km of the S19 expressway in Podlaskie and Podkarpackie, a 60km stretch of the S7 expressway in Mazowsze and Malopolskie and a 50km section of the S11 expressway in Zachodniopomorskie. Late last year, a Polish parliamentary commission said that it had heard that €11.14 billion of road investment within the 2014-2