Skip to main content

Gordie Howe Bridge progresses with community support money pledged

The Windsor-Detroit Bridge Authority and other agencies involved in the US$4.25 billion Gordie Howe International Bridge have pledged millions of dollars in community support. WDBA, contractor Bridging North America, the US state of Michigan and the federal Canadian government announced the support plan, which involves more than 30 agencies and organisations, according to a report by the Canadian Broadcasting Corporation. The plan includes a $15 million Neighbourhood Infrastructure Strategy for both s
June 18, 2019 Read time: 3 mins
The Gordie Howe International Bridge to be open in 2024 (photo courtesy WDBA and Bridging North America)
The Windsor-Detroit Bridge Authority and other agencies involved in the US$4.25 billion %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Gordie Howe International Bridge false https://www.worldhighways.com/sections/key-projects/features/new-international-trade-crossing-linking-canada-and-us/ false false%> have pledged millions of dollars in community support.


WDBA, contractor Bridging North America, the US state of Michigan and the federal Canadian government announced the support plan, which involves more than 30 agencies and organisations, according to a report by the Canadian Broadcasting Corporation.

The plan includes a $15 million Neighbourhood Infrastructure Strategy for both sides of the border, including $6 million for aesthetics and landscaping for communities close to the bridge.

The structure is named after Canadian ice hockey player Gordie Howe who played for many years with the Detroit Red Wings of the National Hockey League and will be open in 2024. It will be the longest cable-stayed bridge in North America and the seventh longest in the world. It will also set the record for longest composite steel and concrete cable-stayed bridge deck in the world.

The fixed-price contract worth $4.25 billion includes the design-build phase and the operation, maintenance and rehabilitation phase. Contractor Bridging North America will receive progress payments during construction and a completion payment at the end of construction. BNA will also receive monthly payments over the 30-year operating period.

The crossing will connect the US city of Detroit and the Canadian city of Windsor on opposite sides of the Detroit River. The bridge will link the Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 - called the Herb Gray Parkway - in the Canadian province of Ontario. The two cities are already connected by the privately owned Ambassador Bridge. But traffic, including heavy trucks, using the bridge must navigate small city streets on both side of the border.

The bridge project includes the Canadian and US ports of entry, the bridge and Michigan Interchange. Preliminary site work started in 2018 and now includes completing final design, conducting environmental reviews, site preparation and soil testing in preparation for primary construction work that begins next year.

Relocation of utilities and test pile driving for the main pier structures are ongoing on the Canadian side. On the Detroit side, workers have been scrubbing – clearing - the land to make way for the entry plaza in the community of Delray. All residents have been relocated from the bridge site on both sides of the border.

In April Officials US officials said toxic industrial chemicals known as PFAS - perfluoroalkyl and polyfluoroalkyl substances - had been found in soil and groundwater on the Detroit site. But soil movement and water clean-up was underway.

Related Content

  • US land sale completed for US-Canada Gordie Howe Bridge
    June 27, 2017
    Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.
  • Cable works starts on Gordie Howe Bridge
    February 10, 2023
    The tolled six-lane bridge over the Detroit River, between Windsor in Canada and Detroit in the US, is costing around US$4.2 billion with an opening date likely in 2025.
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • Construction of the Gordie Howe Bridge could start in mid-2018
    May 12, 2017
    Construction of the US$2.1 billion Gordie Howe International Bridge is expected to start in late 2018, according to the authority in charge of the project. Preliminary early works on bridge – the second to span the Detroit River ? between Detroit, Michigan in the US and Windsor, in the Canadian province of Ontario have started. A main contractor is likely to be appointed by mid next year. The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility