Skip to main content

Germany’s road repair funding shortfall

Germany has a massive backlog of works required on its high speed road network. A report by Germany’s institute for economic research (DIW) says that the backlog of work for the transportation network corresponds will cost in the region of €80 billion to €100 billion to complete. According to the DIW report, around 50% of Autobahn bridges and 20% of Autobahn routes are in a critical state. In addition, German railway company Deutsche Bahn (DB) estimates that there are around 1,400 railway bridges that need
September 30, 2015 Read time: 1 min
Germany has a massive backlog of works required on its high speed road network. A report by Germany’s institute for economic research (DIW) says that the backlog of work for the transportation network corresponds will cost in the region of €80 billion to €100 billion to complete. According to the DIW report, around 50% of Autobahn bridges and 20% of Autobahn routes are in a critical state. In addition, German railway company Deutsche Bahn (DB) estimates that there are around 1,400 railway bridges that need to be upgraded.

Related Content

  • Approval for Moscow’s ring road reconstruction
    October 15, 2015
    Moscow’s ring road is due for rebuilding – Eugene Gerden writes. The Moscow city authorities have finalised the project of the reconstruction of the Moscow Ring Road. The ring road encircles the City of Moscow and the plan was announced by Marat Khusnullin, deputy mayor of the city. Khusnullin said that, to date, the Moscow city government has completed 90% of the design documentation of the project.
  • Wirtgen Group aims for €1.8bn 2012 sales and targets emerging markets
    September 25, 2012
    Wirtgen Group expects to achieve record net sales of €1.8 billion in 2012, according to joint company president Jürgen Wirtgen. The performance forecast for the German road building and quarrying equipment manufacturer – a slight rise on 2011 net sales of €1.76 billion – was revealed as Jürgen and brother and co-Wirtgen Group president, Stefan Wirtgen, told a press conference at the recent Wirtgen Mineral Technology Days event about the company’s sales push in emerging markets.
  • Wirtgen Group aims for €1.8bn 2012 sales and targets emerging markets
    September 25, 2012
    Wirtgen Group expects to achieve record net sales of €1.8 billion in 2012, according to joint company president Jürgen Wirtgen. The performance forecast for the German road building and quarrying equipment manufacturer – a slight rise on 2011 net sales of €1.76 billion – was revealed as Jürgen and brother and co-Wirtgen Group president, Stefan Wirtgen, told a press conference at the recent Wirtgen Mineral Technology Days event about the company’s sales push in emerging markets.
  • German firms see improving market share
    March 1, 2017
    In 2016, German manufacturers of construction equipment achieved a turnover of €9.3 billion, an increase of 3% compared to 2015. Of note though is that the same period, global sales of construction equipment declined by 1%. German companies managed to perform better than the world market and develop market share. In 2017, they expect another increase in sales by 3%.