Skip to main content

Germany to cut red tape for bridge construction up to 2027

The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working
October 5, 2017 Read time: 3 mins
The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027.


Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance.

The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working week are in the pipeline, said Wust.

The moves are part of a strategy to work more closely with the private sector to establish a new trust in the relationships, reported German media. That relationship has soured because of red tape by government authorities which has led to the country’s road infrastructure becoming dilapidated, according to transport critics.

Last year even the 3684 International Monetary Fund urged Germany to remove administrative and regulatory constraints in municipalities to get much needed repairs underway faster.

During the recent federal election, federal Chancellor Angela Merkel told voters that the main obstacle to more spending on infrastructure is not a lack of money but poor planning processes. She promised to cut red tape and get projects moving from planning to construction phases much quicker than in the recent past.

A case in point is the heavily-used cable stay A1 Rheinbrücke, an A1 autobahn bridge over the Rhine River that connects the city of Cologne with Leverkusen. The Leverkusen Bridge, as it is often called, was opened in 1965 and by 2012 it was carrying 128,000 cars and 14,000 lorries daily, more than it was designed to carry.

The bridge is just over 1km long and has a main span of 280m. Its width of nearly 32m includes the expansion of its original four lanes to six in the mid-1990s. In 2012, it was also closed to heavy goods vehicles. The closure has added 40 minutes and 30km to the average truck trip as driver’s clog other arterial roads looking for short-cuts.

A new bridge, though, is in the planning stages with completion likely around 2020. Handelsblatt reported that the Leverkusen Bridge is beyond repair and the cost of replacing it is pegged at around €600 million. The bridge is to be replaced at the same location by two bridges, each with five lanes and footpaths on both sides.

For more information on companies in this article

Related Content

  • £8 billion UK tunnel project to go ahead
    January 30, 2025
    The £8 billion UK Lower Thames Crossing tunnel project is to go ahead.
  • “It’s road maintenance stupid,” MEP Michael Cramer tells pavement preservation and recycling summit PPRS Paris 2015
    February 23, 2015
    Road owners around the world “need a highway to heaven” according to Michael Cramer MEP, chairman of the European Parliament transport committee. Speaking at PPRS Paris 2015, the pavement preservation and recycling summit, Cramer said that Europe’s current road policy “lies somewhere between AC/DC’s Highway to Hell and Led Zeppelin’s Stairway to Heaven” and that, to mis-quote Bill Clinton, the EU needs to start thinking “it’s road maintenance stupid” whenever the subject of highway investment is under consi
  • Aggregate Industries lightens the load for the Acton Swing Bridge
    October 2, 2018
    Aggregates Industries recently lightened the load for the 73m-long bow string truss Acton Swing Bridge in England. When opened in 1933, it was the first floating swing bridge in the UK – floating on a pontoon. The 84-year-old bridge, which is cared for by the Canal & River Trust charity, carries the busy A49 road over the River Weaver Navigation, in the county of Cheshire. A recent €1.7 million complete refurbishment included strengthening works to the underside of the bridge as well as improvements to its
  • Aggregate Industries Lytag concrete reduces weight of Acton Bridge
    August 10, 2018
    The 84-year-old Acton Swing Bridge in the UK recently underwent a major renovation that included the use of Aggregates Industries’ Lytag lightweight concrete. The bridge - cared for by the Canal & River Trust, a charity operating in England and Wales - carries the busy A49 road over the River Weaver Navigation canal, near Cheshire in England. The €1.7 million complete refurbishment included strengthening the underside of the bridge as well as improvements to its appearance. Core to the project’s success