Skip to main content

Germany to cut red tape for bridge construction up to 2027

The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working
October 5, 2017 Read time: 3 mins
The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027.


Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance.

The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working week are in the pipeline, said Wust.

The moves are part of a strategy to work more closely with the private sector to establish a new trust in the relationships, reported German media. That relationship has soured because of red tape by government authorities which has led to the country’s road infrastructure becoming dilapidated, according to transport critics.

Last year even the 3684 International Monetary Fund urged Germany to remove administrative and regulatory constraints in municipalities to get much needed repairs underway faster.

During the recent federal election, federal Chancellor Angela Merkel told voters that the main obstacle to more spending on infrastructure is not a lack of money but poor planning processes. She promised to cut red tape and get projects moving from planning to construction phases much quicker than in the recent past.

A case in point is the heavily-used cable stay A1 Rheinbrücke, an A1 autobahn bridge over the Rhine River that connects the city of Cologne with Leverkusen. The Leverkusen Bridge, as it is often called, was opened in 1965 and by 2012 it was carrying 128,000 cars and 14,000 lorries daily, more than it was designed to carry.

The bridge is just over 1km long and has a main span of 280m. Its width of nearly 32m includes the expansion of its original four lanes to six in the mid-1990s. In 2012, it was also closed to heavy goods vehicles. The closure has added 40 minutes and 30km to the average truck trip as driver’s clog other arterial roads looking for short-cuts.

A new bridge, though, is in the planning stages with completion likely around 2020. Handelsblatt reported that the Leverkusen Bridge is beyond repair and the cost of replacing it is pegged at around €600 million. The bridge is to be replaced at the same location by two bridges, each with five lanes and footpaths on both sides.

For more information on companies in this article

Related Content

  • Detroit-Windsor Tunnel crossing gets new customs facilities
    February 17, 2015
    The governments of Canada and the province of Ontario officially opened a new customs plaza at the Windsor-Detroit Tunnel, one of the busiest road crossings between the United States and Canada. The Canadian federal government provided US$8 and the province added $20 million for the project that is part of security improvements and to speed up people processing facilities on the Canadian side of the tunnel. Among the upgrades are new vehicle access lanes, new buildings for the Canada Border Services Agency
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
  • Rotterdam’s bridge link upgrade project
    June 18, 2020
    Rotterdam’s bridge link upgrade project is being planned.
  • Volvo CE’s Carl Slotte explains the division’s current line-up
    October 11, 2017
    Next year Volvo CE will be testing electric, hybrid and autonomous vehicles in a quarry. Carl Slotte, head of sales for EMEA, says no company by itself will win market share. David Arminas reports from Germany The driver of the charter bus stood outside the hotel in Trier, Germany, and waved at a passing local city bus. “I know the driver,” he told one of the assembled journalists waiting for the group’s ride to the nearby Volvo CE plant. “He is retired but they brought him back because young people th