Skip to main content

Germany to cut red tape for bridge construction up to 2027

The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working
October 5, 2017 Read time: 3 mins
The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027.


Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance.

The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working week are in the pipeline, said Wust.

The moves are part of a strategy to work more closely with the private sector to establish a new trust in the relationships, reported German media. That relationship has soured because of red tape by government authorities which has led to the country’s road infrastructure becoming dilapidated, according to transport critics.

Last year even the 3684 International Monetary Fund urged Germany to remove administrative and regulatory constraints in municipalities to get much needed repairs underway faster.

During the recent federal election, federal Chancellor Angela Merkel told voters that the main obstacle to more spending on infrastructure is not a lack of money but poor planning processes. She promised to cut red tape and get projects moving from planning to construction phases much quicker than in the recent past.

A case in point is the heavily-used cable stay A1 Rheinbrücke, an A1 autobahn bridge over the Rhine River that connects the city of Cologne with Leverkusen. The Leverkusen Bridge, as it is often called, was opened in 1965 and by 2012 it was carrying 128,000 cars and 14,000 lorries daily, more than it was designed to carry.

The bridge is just over 1km long and has a main span of 280m. Its width of nearly 32m includes the expansion of its original four lanes to six in the mid-1990s. In 2012, it was also closed to heavy goods vehicles. The closure has added 40 minutes and 30km to the average truck trip as driver’s clog other arterial roads looking for short-cuts.

A new bridge, though, is in the planning stages with completion likely around 2020. Handelsblatt reported that the Leverkusen Bridge is beyond repair and the cost of replacing it is pegged at around €600 million. The bridge is to be replaced at the same location by two bridges, each with five lanes and footpaths on both sides.

For more information on companies in this article

Related Content

  • Cianbro picks up another contract for Washington’s Memorial Bridge
    July 15, 2015
    The 1930’s Arlington Memorial Bridge in Washington, which has carried US presidents and military heroes across the Potomac River to the famous Arlington Cemetery, is to undergo refurbishment, again. Cianbro Corporation, based in the state of Maine and which worked on the bridge in 2013, picked up the contract for US$2,523,520, according to a notice on the FedBizOpps.gov website. The Federal Business Opportunities website had earlier this year asked for submissions for the work: “The project will be sp
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Concern over the state of US bridges
    April 1, 2019
    Bridge condition is a serious concern in the US, according to a new report from American Road & Transportation Builders Association (ARTBA).