Skip to main content

German government to adhere to Fehmarn Belt tunnel plans

Germany is to adhere to plans for a tunnel between Fehmarn, Germany, and Lolland, Denmark despite criticism over the cost and a delayed schedule. Denmark alone is likely to foot the €7.4 billion bill for the prestigious Fehmarn Belt Fixed Link immersed tunnel while Germany will pay for only access roads and other connections on its territory. Angela Merkel, Chancellor of Germany, said her government and transport authorities will respond to more than 3,000 objections over the construction of the tunne
April 30, 2015 Read time: 2 mins
Germany is to adhere to plans for a tunnel between Fehmarn, Germany, and Lolland, Denmark despite criticism over the cost and a delayed schedule.

Denmark alone is likely to foot the €7.4 billion bill for the prestigious Fehmarn Belt Fixed Link immersed tunnel while Germany will pay for only access roads and other connections on its territory.

Angela Merkel, Chancellor of Germany, said her government and transport authorities will respond to more than 3,000 objections over the construction of the tunnel. German media reported that the audit committee of the German lower house may exam the possibility of new negotiations for the state contract as the costs for the connection has become more expensive than expected.

The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel, including two railway tunnels, two motorway tunnels and an emergency tunnel, will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn Island is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

3260 World Highways reported in February that the Danish government was talking to contractors over the latest rise, a jump of €1.2 billion, in cost estimates for entire project. Contractors estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million.

For more information on companies in this article

Related Content

  • Progress for planned Denmark-Germany immersed tunnel
    October 30, 2013
    A Danish company, Femern, is submitting documents for the Fehmarn Belt Fixed Link, an immersed tunnel that will connect Germany with Denmark. The project is expected to cost in the order of €5.5 billion to construct. An 18km immersed tunnel will link the islands of Fehmarn and Lolland. Fehmarn Island is already connected with Northern Germany’s mainland by a bridge, while Lolland is already connected by a tunnel and bridges with Zealand, a link that runs via the island of Falster
  • Zealand to gain from Fehmarn Belt tunnel
    July 2, 2021
    The number of commuters crossing the Fehmarn Belt, a Baltic Sea strait that separates a German island and a Danish island, could reach 1.2 million by 2030, notes a new report.
  • Costs revised for Denmark’s proposed Kattegat Bridge
    May 9, 2016
    A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report. The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll. A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the mi
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as