Skip to main content

Galliford Try aims to downsize its construction business

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
April 25, 2019 Read time: 3 mins
Liebherr cranes at work on the Queensferry Crossing, Scotland

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing.

“The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement.

“The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of positions in legacy and some current contracts and the effect of some recent adverse settlements, as well as the costs of the restructure. The single largest element relates to the Queensferry Crossing joint venture, which has recently increased its estimated final costs on the project,” the statement noted.

Galliford Try was part the consortium including 917 ACS (Hotchief, 4761 Dragados) and 1021 American Bridge to build the road bridge over the River Forth that was originally set at £795 million (€920 million) in 2011. The 2.7km bridge was officially opened by the UK’s Queen Elizabeth in September 2017 (see 3260 World Highways, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external key project report false http://www.worldhighways.com/sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ false false%>, November 2015).

The three-tower cable stayed bridge was built alongside the existing Forth Road Bridge and carries the M90 motorway across the Firth of Forth between Edinburgh, at South Queensferry, and Fife, at North Queensferry. The final cost came in at £1.35 billion (€1.56 billion).

Galliford also said that it is assessing its work and costs on the completed Aberdeen Western Peripheral Route. “The board expects that the outcome of this assessment will reduce the group's full year post‐exceptional profit before tax by £30-40 million (€35-46 million) below the current consensus analysts' forecast.”

The contract for 4068 Transport Scotland’s Aberdeen Western Peripheral Route - unofficially called the Aberdeen bypass – was awarded in June 2014 to Connect Roads, a joint venture between 1146 Balfour Beatty Investments, 2435 Carillion Private Finance (Transport) and 3932 Galliford Try Investments. The final section of the bridge was opened in February.

The estimated cost in 2009 was up to £395 million (€457 million) but rose to around £745 million (€862 million) by 2016. The collapse of Carillion and some issues with concrete helped push the final price tag to over £1 billion (€1.15 billion), according to media reports.

Galliford’s announcement to cut back its construction division comes after the company appointed Graham Prothero as chief executive last month. Prothero, who joined the company as finance director in 2013, takes over from Peter Truscott who said he is leaving to pursue other opportunities. Prothero’s career includes finance director at Development Securities and as a partner at 5483 Ernst &amp; Young consultants. A corporate statement at the time of his appointment said he will “maintain Galliford Try’s progress towards the group’s 2021 strategy”.

For more information on companies in this article

Related Content

  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Jobs lost at ailing Cleveland Bridge
    August 6, 2021
    The steel fabricator in Darlington, England, is now up for sale.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • Contractors demand tenders for Carillion’s work in Alberta, Canada
    July 25, 2018
    Road contractors in the Canadian province of Alberta are demanding tenders be conducted for maintenance contracts that are currently run by Carillion, now in receivership. Carillion, based in the UK, went into receivership in January, and its Canadian operations did so as well, around a week later. The call for tenders in Alberta arose when the Alberta Roadbuilders and Heavy Construction Association learned that more than US$380 million worth of road contracts are likely to be handed over to Emcon, a