Skip to main content

Galliford Try aims to downsize its construction business

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
April 25, 2019 Read time: 3 mins
Liebherr cranes at work on the Queensferry Crossing, Scotland

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing.

“The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement.

“The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of positions in legacy and some current contracts and the effect of some recent adverse settlements, as well as the costs of the restructure. The single largest element relates to the Queensferry Crossing joint venture, which has recently increased its estimated final costs on the project,” the statement noted.

Galliford Try was part the consortium including 917 ACS (Hotchief, 4761 Dragados) and 1021 American Bridge to build the road bridge over the River Forth that was originally set at £795 million (€920 million) in 2011. The 2.7km bridge was officially opened by the UK’s Queen Elizabeth in September 2017 (see 3260 World Highways, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external key project report false http://www.worldhighways.com/sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ false false%>, November 2015).

The three-tower cable stayed bridge was built alongside the existing Forth Road Bridge and carries the M90 motorway across the Firth of Forth between Edinburgh, at South Queensferry, and Fife, at North Queensferry. The final cost came in at £1.35 billion (€1.56 billion).

Galliford also said that it is assessing its work and costs on the completed Aberdeen Western Peripheral Route. “The board expects that the outcome of this assessment will reduce the group's full year post‐exceptional profit before tax by £30-40 million (€35-46 million) below the current consensus analysts' forecast.”

The contract for 4068 Transport Scotland’s Aberdeen Western Peripheral Route - unofficially called the Aberdeen bypass – was awarded in June 2014 to Connect Roads, a joint venture between 1146 Balfour Beatty Investments, 2435 Carillion Private Finance (Transport) and 3932 Galliford Try Investments. The final section of the bridge was opened in February.

The estimated cost in 2009 was up to £395 million (€457 million) but rose to around £745 million (€862 million) by 2016. The collapse of Carillion and some issues with concrete helped push the final price tag to over £1 billion (€1.15 billion), according to media reports.

Galliford’s announcement to cut back its construction division comes after the company appointed Graham Prothero as chief executive last month. Prothero, who joined the company as finance director in 2013, takes over from Peter Truscott who said he is leaving to pursue other opportunities. Prothero’s career includes finance director at Development Securities and as a partner at 5483 Ernst &amp; Young consultants. A corporate statement at the time of his appointment said he will “maintain Galliford Try’s progress towards the group’s 2021 strategy”.

For more information on companies in this article

Related Content

  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • Russian bypass projects under construction
    October 5, 2018
    The Russian government is starting a major programme of building bypasses around large cities during the current financial year – Eugene Gerden writes The Russian government is starting a massive programme of building bypasses around the country’s biggest cities during this financial year. The aim is to address the problems of traffic jams and speeding traffic on federal routes, according to recent statements by the Russian Presidential Administration and some senior officials from the Ministry of Trans
  • New Clyde bridge project
    March 12, 2021
    A New Clyde bridge project is going ahead.
  • Liverpool picks winners for €313 million of highway works
    September 13, 2019
    Colas and Tarmac are among the winning contractors being placed on a €313 million framework deal for highways planned maintenance in Liverpool, England. The four-year framework is divided into three lots and is available to local governments in the greater Liverpool City area in northwest England. Suppliers for Lot 1 (works under €559,000) are Huyton Asphalt, Dyer and Butler, King Construction, Dowhigh, Aggregate Industries and Colas. Lot 2 suppliers (works from €279,000 to €6.7 million) are Huyton