Skip to main content

Galliford Try aims to downsize its construction business

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
April 25, 2019 Read time: 3 mins
Liebherr cranes at work on the Queensferry Crossing, Scotland

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing.

“The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement.

“The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of positions in legacy and some current contracts and the effect of some recent adverse settlements, as well as the costs of the restructure. The single largest element relates to the Queensferry Crossing joint venture, which has recently increased its estimated final costs on the project,” the statement noted.

Galliford Try was part the consortium including 917 ACS (Hotchief, 4761 Dragados) and 1021 American Bridge to build the road bridge over the River Forth that was originally set at £795 million (€920 million) in 2011. The 2.7km bridge was officially opened by the UK’s Queen Elizabeth in September 2017 (see 3260 World Highways, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external key project report false http://www.worldhighways.com/sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ false false%>, November 2015).

The three-tower cable stayed bridge was built alongside the existing Forth Road Bridge and carries the M90 motorway across the Firth of Forth between Edinburgh, at South Queensferry, and Fife, at North Queensferry. The final cost came in at £1.35 billion (€1.56 billion).

Galliford also said that it is assessing its work and costs on the completed Aberdeen Western Peripheral Route. “The board expects that the outcome of this assessment will reduce the group's full year post‐exceptional profit before tax by £30-40 million (€35-46 million) below the current consensus analysts' forecast.”

The contract for 4068 Transport Scotland’s Aberdeen Western Peripheral Route - unofficially called the Aberdeen bypass – was awarded in June 2014 to Connect Roads, a joint venture between 1146 Balfour Beatty Investments, 2435 Carillion Private Finance (Transport) and 3932 Galliford Try Investments. The final section of the bridge was opened in February.

The estimated cost in 2009 was up to £395 million (€457 million) but rose to around £745 million (€862 million) by 2016. The collapse of Carillion and some issues with concrete helped push the final price tag to over £1 billion (€1.15 billion), according to media reports.

Galliford’s announcement to cut back its construction division comes after the company appointed Graham Prothero as chief executive last month. Prothero, who joined the company as finance director in 2013, takes over from Peter Truscott who said he is leaving to pursue other opportunities. Prothero’s career includes finance director at Development Securities and as a partner at 5483 Ernst &amp; Young consultants. A corporate statement at the time of his appointment said he will “maintain Galliford Try’s progress towards the group’s 2021 strategy”.

For more information on companies in this article

Related Content

  • Cleveland Bridge reports healthy results
    September 30, 2019
    Cleveland Bridge UK reports healthy results for the fourth consecutive year. The firm’s strong profits are said to add further strength to its balance sheet and it is continuing to develop its order book with new projects. Despite uncertainty in the UK construction sector due to Brexit, the Darlington-based company achieved a turnover of £37 million for its financial year ending 31st December 2018, with an operating profit of £1.2 million and an improving balance sheet. Cleveland Bridge continued to grow
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Denmark’s Roskilde Bridge officially opened
    October 1, 2019
    The official opening of Denmark’s new Roskilde Bridge has been carried out. The structure has been named Crown Princess Mary´s Bridge. The 1.3km structure is the first cantilevered bridge to be built in Denmark since 1970. Construction took 36 months and the work was completed three months ahead of schedule. The project posed some challenges to the engineers and designers as the construction work was subject to environmental restrictions. Because it lies close to a residential area and a summerhouse area,
  • Sunny and clear days in Scotland for Clearview’s SolarLite studs
    January 7, 2019
    industry award. Clearview Intelligence, in partnership with Transport Scotland, Amey and Edinburgh Napier University, has been named as a finalist in the Road Safety, Traffic Management and Enforcement category at the National Transport Awards. It follows the installation of 4,100 SolarLite Active Road Studs along 22.5km of Scotland’s A1 between Dunbar and Berwick following concerns about the unlit road. The scheme emphasises the delineation of the road layout and junctions, providing up to 900m of visib