Skip to main content

Frankfurt highway section to run in tunnel

A tunnel has been proposed for a highway stretch in the German city of Frankfurt. The proposals put forward by the city authorities call for a 1km stretch of the A661 Autobahn to run in a cut and cover tunnel. The project would cost around €350 million and would allow housing to be built over the top of the route. A substantial portion of the funding would have to be sourced from the German Federal Government and the Hesse State Government for the project to go ahead however. If the proposals are accepted,
March 12, 2019 Read time: 1 min
A tunnel has been proposed for a highway stretch in the German city of Frankfurt. The proposals put forward by the city authorities call for a 1km stretch of the A661 Autobahn to run in a cut and cover tunnel. The project would cost around €350 million and would allow housing to be built over the top of the route. A  substantial portion of the funding would have to be sourced from the German Federal Government and the Hesse State Government for the project to go ahead however. If the proposals are accepted, the new link could be ready by 2028.

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • New Zealand highway proposed
    June 15, 2021
    A potentially controversial tolled highway project has been proposed for New Zealand's South Island.
  • New underground road project proposed for Brisbane
    August 19, 2022
    A new underground road project is being proposed for Brisbane.
  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built