Skip to main content

Fluor team selected for South Carolina port access road project

A consortium led by Fluor has been selected by South Carolina’s Department of Transportation to design and build the Port Access Road Project in Charleston. The project, in one of the US’s fastest growing container ports, will provide direct access between the proposed marine container terminal to be on the former naval base and Interstate 26.
April 27, 2016 Read time: 2 mins

A consortium led by 6343 Fluor has been selected by South Carolina’s Department of Transportation to design and build the Port Access Road Project in Charleston.

The project, in one of the US’s fastest growing container ports, will provide direct access between the proposed marine container terminal to be on the former naval base and Interstate 26.

The Fluor-Lane South Carolina consortium is comprised of Fluor and the 2878 Lane Construction Corporation. Construction is expected to start later this year with expected completion in late 2019.

Works include local roadway enhancements to integrate container terminal traffic with existing traffic as well as support regional transport strategies and minimise an impact on the nearby communities and traveling public.

Specifically, the project consists of a new fully directional interchange on I-26, Bainbridge Connector Road, the extension of Stromboli Avenue and associated roadway improvements to surface streets to serve the proposed Naval Base Terminal.

Fluor said in a written statement that it plans to book its share of the contract value in the second quarter of 2016. The company is a global engineering design and construction business based in Irving, Texas. Revenue in 2015 was of US$18.1 billion and the company has around 59,000 employees worldwide.

“We understand the economic importance of commerce and state-wide impact the Port of Charleston has on this region,” said Hans Dekker, president of Fluor’s infrastructure business. “We believe our local team is uniquely qualified to deliver this design-build project on time and on budget by providing capital efficiency and integrated solutions to support the vitality of the fastest growing major container port in the U.S.”

For more information on companies in this article

Related Content

  • Major project for Milwaukee
    March 1, 2012
    In the US city of Milwaukee plans are in hand for a major highway upgrade that is expected to cost US$300 million.
  • Major project for Milwaukee
    May 3, 2012
    In the US city of Milwaukee plans are in hand for a major highway upgrade that is expected to cost US$300 million. The upgrade will focus on Interstate 794 where it runs through the centre of Milwaukee, as well as the Hoan Bridge. This three year project is due to start at the end of 2013 and will improve connections with the Port of Milwaukee.
  • Piling starts in Parkes for bypass project
    October 20, 2023
    Two new bridges are part of the US$120 million Parkes Bypass Project in the Australian state of New South Wales.
  • Hitachi and Deere end their joint venture
    August 24, 2021
    Hitachi Construction Machinery has ended the manufacturer's joint venture relationship with Deere & Company in North, Central and South America.