Skip to main content

Fluor team selected for South Carolina port access road project

A consortium led by Fluor has been selected by South Carolina’s Department of Transportation to design and build the Port Access Road Project in Charleston. The project, in one of the US’s fastest growing container ports, will provide direct access between the proposed marine container terminal to be on the former naval base and Interstate 26.
April 27, 2016 Read time: 2 mins

A consortium led by 6343 Fluor has been selected by South Carolina’s Department of Transportation to design and build the Port Access Road Project in Charleston.

The project, in one of the US’s fastest growing container ports, will provide direct access between the proposed marine container terminal to be on the former naval base and Interstate 26.

The Fluor-Lane South Carolina consortium is comprised of Fluor and the 2878 Lane Construction Corporation. Construction is expected to start later this year with expected completion in late 2019.

Works include local roadway enhancements to integrate container terminal traffic with existing traffic as well as support regional transport strategies and minimise an impact on the nearby communities and traveling public.

Specifically, the project consists of a new fully directional interchange on I-26, Bainbridge Connector Road, the extension of Stromboli Avenue and associated roadway improvements to surface streets to serve the proposed Naval Base Terminal.

Fluor said in a written statement that it plans to book its share of the contract value in the second quarter of 2016. The company is a global engineering design and construction business based in Irving, Texas. Revenue in 2015 was of US$18.1 billion and the company has around 59,000 employees worldwide.

“We understand the economic importance of commerce and state-wide impact the Port of Charleston has on this region,” said Hans Dekker, president of Fluor’s infrastructure business. “We believe our local team is uniquely qualified to deliver this design-build project on time and on budget by providing capital efficiency and integrated solutions to support the vitality of the fastest growing major container port in the U.S.”

For more information on companies in this article

Related Content

  • Innovative traffic information technology used in Vancouver
    April 12, 2012
    As the world descended on Vancouver for the 2010 Winter Olympics, visitors were able to travel around the city with confidence and intelligence thanks to a landmark project by IRF Member, Delcan
  • Key Florida highway link wins major award
    July 2, 2014
    A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the
  • Innovative traffic information technology used in Vancouver
    February 23, 2012
    As the world descended on Vancouver for the 2010 Winter Olympics, visitors were able to travel around the city with confidence and intelligence thanks to a landmark project by IRF Member, Delcan
  • Parsons Brinckerhoff is working on a key project in North Carolina
    May 7, 2013
    Parsons Brinckerhoff is now working with Blythe Construction on a US$69 million project for the Salem Creek Connector in Winston-Salem. The deal was awarded by the North Carolina Department of Transportation (NCDOT) and the two companies are handling the design and construction for a 1.7km section of four-lane highway on US52, which includes concrete pavement widening work. The project includes a new diverging diamond interchange and eight new bridges, including two railroad bridges. The new roadway is red