Skip to main content

Florida replacing Howard Frankland Bridge

Florida Department of Transportation (FDOT) is working on plans to replace the Howard Franklin Bridge. The project is now expected to cost US$814 million, an increase from the $750 million originally envisaged. The contract is expected to be awarded in 2019, with construction commencing in 2020. The first stage of the project should be ready for use in 2024, providing a significant increase in daily capacity and boosting the emergency evacuation capacity also. The new bridge will carry four lanes of traffi
August 22, 2018 Read time: 2 mins

2697 Florida Department of Transportation (FDOT) is working on plans to replace the Howard Franklin Bridge. The project is now expected to cost US$814 million, an increase from the $750 million originally envisaged. The contract is expected to be awarded in 2019, with construction commencing in 2020. The first stage of the project should be ready for use in 2024, providing a significant increase in daily capacity and boosting the emergency evacuation capacity also.

The new bridge will carry four lanes of traffic in either direction, replacing the existing structure which was built in the 1960s and is now reaching the end of its working life.

The structure will feature four southbound lanes for traffic in the direction of St Petersburg. The design includes four express toll lanes, with two lanes in either direction. Only drivers paying tolls will be allowed to use the express lanes, with the charges varying depending on demand.

The plans call for the existing southbound bridge, which was built in 1990, to be switched to carry northbound traffic. Further in the future, the new bridge will carry light rail (on lanes that will initially be used for northbound traffic) and an additional structure will be constructed to carry extra northbound traffic lanes. The new design also includes facilities for cyclists and pedestrians.

Once the new bridge is in use, the old structure will be demolished. However FDOT will also take care over the demolition work, which will be carried out in accordance with the strict environmental restrictions in the state and will ensure no contaminants affect the water resources.

For more information on companies in this article

Related Content

  • Tackling Florida’s highway congestion
    August 5, 2016
    Congestion is a major problem in certain areas of US state Florida. Large number of commuters and tourists means that central Florida’s Interstate 4 (I-4) highway suffers particularly from congestion. Its proximity to Disneyland means that the traffic often comes to a complete standstill. A 2012 report from the Texas Transportation Institute ranked Orlando 13th in the US for traffic congestion, with more than 1.5 million daily trips on I-4. The report estimates that each frustrated commuter wastes about 45
  • Parsons wins Florida interchange redesign contract
    February 23, 2017
    The Florida Department of Transportation has awarded Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected. The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-9
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • New bridge being planned for German city Bonn
    July 16, 2018
    A new bridge project is being planned for the German city of Bonn. The city has three bridges crossing the Rhein River, the North, South and Kennedy Bridges. The North Bridge is in need of replacement as it is no longer able to meet the city’s traffic needs. The existing structure will be demolished and replaced with a new bridge in a project worth €205 million. Plans should be ready for the new link in 2020, with construction expected to commence in 2028.