Skip to main content

Flatiron wins Winnipeg interchange project in Canada

US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
August 5, 2015 Read time: 2 mins
US-based contractor 2758 Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba.

The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101.

Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embankment and demolition of a bridge and some roadway upgrades.

Provincial Trunk Highways 101 and 100 are together known as Winnipeg’s Perimeter Highway, around 90km long. It is an alternate route for through traffic, as there are no freeways through the city.

In June, Flatiron started work on a 3.4km Champlain Bridge across the St Lawrence River in Montreal, in the province of Quebec. The bridge is downstream from the existing Champlain Bridge, built in the 1960s. The new bridge includes three corridors, with two three-lane corridors for vehicle traffic and a two-lane transit corridor with light rail transit capabilities for future use.

For more information on companies in this article

Related Content

  • Tasmanian bridge proposal faces controversy
    October 27, 2020
    The design proposal for a new Tasmanian bridge project faces controversy.
  • New Zealand link
    May 15, 2012
    A major milestone has been achieved in New Zealand on a major road project that is intended to deal with a major traffic bottleneck in the city of Auckland. The launching gantry team has now installed the last segment of the new northbound viaduct, a key stage in the Newmarket Viaduct Replacement project. There is currently a 1.5m gap between the segments. So, on Saturday 3rd and Sunday 4th December the two viaducts will be cemented together in an 18 hour procedure known as the Stitch. From then until the e
  • Boom in Asian infrastructure investment
    April 5, 2012
    Investment in China and India continues unabated, but other nations on the continent are eager to attract companies as Patrick Smith reports Asia is still booming despite the current economic crisis, and new infrastructure programmes are constantly coming on stream. Powerhouses China and India, with their double-digit growth figures and huge infrastructure plans (in scope and cost), are leading the way and are still magnets for businesses wishing to expand, both in terms of facilities and customers. But oth
  • $152 million SC interchange project for Webuild
    February 28, 2025
    Webuild is carrying out a $152 million interchange project in South Carolina.