Skip to main content

Flatiron wins Winnipeg interchange project in Canada

US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
August 5, 2015 Read time: 2 mins
US-based contractor 2758 Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba.

The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101.

Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embankment and demolition of a bridge and some roadway upgrades.

Provincial Trunk Highways 101 and 100 are together known as Winnipeg’s Perimeter Highway, around 90km long. It is an alternate route for through traffic, as there are no freeways through the city.

In June, Flatiron started work on a 3.4km Champlain Bridge across the St Lawrence River in Montreal, in the province of Quebec. The bridge is downstream from the existing Champlain Bridge, built in the 1960s. The new bridge includes three corridors, with two three-lane corridors for vehicle traffic and a two-lane transit corridor with light rail transit capabilities for future use.

For more information on companies in this article

Related Content

  • Progress delayed on Kenya's vital highway link
    February 16, 2012
    Kenya is investing in road developments , reports Shem Oirere. A multi-million dollar highway expansion project in Kenya's capital Nairobi may now be delayed for close to a year because of a huge underground network of water, electricity and communication pipes and cables that has slowed down construction works.
  • Strabag wins German A3 Autobahn contract
    July 24, 2015
    Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad
  • Utah key highway connection project
    February 23, 2018
    Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons. Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake
  • Ontario embarks upon major road repair programme
    June 14, 2019
    The Canadian province of Ontario has earmarked around US$1 billion for road repairs and upgrades during 2019. The money is for 123 projects of which around $384 million will go to 20 projects in central Ontario. Northeastern Ontario will receive $218 million for 32 highway projects, mostly along Highway 11 – at nearly 1,800km the second longest in Ontario, Canada’s mostly populous province. Highway 11 runs from the provincial capital Toronto northwards and then westwards to the border with Manitoba pr