Skip to main content

Flatiron wins Winnipeg interchange project in Canada

US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
August 5, 2015 Read time: 2 mins
US-based contractor 2758 Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba.

The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101.

Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embankment and demolition of a bridge and some roadway upgrades.

Provincial Trunk Highways 101 and 100 are together known as Winnipeg’s Perimeter Highway, around 90km long. It is an alternate route for through traffic, as there are no freeways through the city.

In June, Flatiron started work on a 3.4km Champlain Bridge across the St Lawrence River in Montreal, in the province of Quebec. The bridge is downstream from the existing Champlain Bridge, built in the 1960s. The new bridge includes three corridors, with two three-lane corridors for vehicle traffic and a two-lane transit corridor with light rail transit capabilities for future use.

For more information on companies in this article

Related Content

  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Strabag leads consortium for planned Polish project
    July 24, 2014
    Austrian contractor Strabag will lead the consortium constructing a stretch of the S7 expressway in Poland. Strabag is teaming up with Heilit+Woerner for the project to build the Trasa Nowohucka section of the S7 linking Rybitwy and Igołomska and lying to the east of Kraków. Construction work is commencing in August/September 2014 and the contract is worth around €130 million. The consortium is handling the upgrading and construction work for some 18.6km of roads in all. The work includes widening a 4.5km l
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • New UK road link planned
    August 25, 2020
    A new UK road project is being planned.