Skip to main content

Flatiron wins Winnipeg interchange project in Canada

US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
August 5, 2015 Read time: 2 mins
US-based contractor 2758 Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba.

The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101.

Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embankment and demolition of a bridge and some roadway upgrades.

Provincial Trunk Highways 101 and 100 are together known as Winnipeg’s Perimeter Highway, around 90km long. It is an alternate route for through traffic, as there are no freeways through the city.

In June, Flatiron started work on a 3.4km Champlain Bridge across the St Lawrence River in Montreal, in the province of Quebec. The bridge is downstream from the existing Champlain Bridge, built in the 1960s. The new bridge includes three corridors, with two three-lane corridors for vehicle traffic and a two-lane transit corridor with light rail transit capabilities for future use.

For more information on companies in this article

Related Content

  • Bold move aids Ironton-Russell bridge works in U.S.
    January 24, 2014
    The bold decision to go against the norm and build the back spans using falsework for the Ironton-Russell replacement bridge between Parkersburg, Kentucky and Cincinnati, Ohio allowed land access to build the main span which, along with the first use in the U.S. of precast stay anchor blocks, meant the new structure could get built.
  • Temporary bridges for Michigan highway works
    September 21, 2023
    Temporary bridges will help with Michigan highway works.
  • IRD wins Georgia state weigh-in-motion deal
    March 9, 2015
    International Road Dynamics (IRD) will design, supply and install 19 mainline weigh-in-motion systems throughout the US State of Georgia. IRD, based in the city of Saskatoon in the Canadian province of Saskatchewan, said the contract is worth US$7.93 million. The deal includes mainline WIM scales on the interstate, at the roadside and in scale houses as well as license plate reading, USDOT number reading, side view cameras and over-height detection systems at 19 weigh station locations. IRD’s systems will c
  • Piling starts in Parkes for bypass project
    October 20, 2023
    Two new bridges are part of the US$120 million Parkes Bypass Project in the Australian state of New South Wales.