Skip to main content

Five consortia vie for Paraguay’s first phase of bi-oceanic corridor

Five consortia are vying for the contract to pave 255km of Paraguay’s bi-oceanic corridor project - the Loma Plata-Carmelo Peralta road paving works. The five consortia are INECS, EPI, ACI Proyectos Cialpa, Geocon-MCSA and Loma Plata. The 255km contract is the first phase, costing US$300 million, of a 1,045km overall corrider that will need around $926 million. Tenders for the first phase were launched in November covering the section between Carmelo Peralta, Cruce Centinela and Loma Plata in the w
March 14, 2016 Read time: 2 mins
Five consortia are vying for the contract to pave 255km of Paraguay’s bi-oceanic corridor project - the Loma Plata-Carmelo Peralta road paving works.

The five consortia are INECS, EPI, ACI Proyectos Cialpa, Geocon-MCSA and Loma Plata.

The 255km contract is the first phase, costing US$300 million, of a 1,045km overall corrider that will need around $926 million.

Tenders for the first phase were launched in November covering the section between Carmelo Peralta, Cruce Centinela and Loma Plata in the western region of the country under a turnkey format. The tender winner for the first phase must finance the construction and be repaid upon completion. But funds may also be sought from international investors for the second phase if the tender winner cannot self-finance the work.

World Highways reported in November that the second stage of the project that will connect Paraguay with Argentina and cost $340 million. Work include paving the Cruce Centinela-Mariscal Estigarribia-Pozo Hondo road section.

The tender for the development of the final engineering design of the second section will be launched in 2016.

The third phase of the initiative is construction of the bridge over the Paraguay River between the cities of Carmelo Peralta in Paraguay and Puerto Murtinho in Brazil. Details of the project are outlined in the Cosiplan project portfolio from the Union of South American Nations.

Meanwhile, the Commission of Public Works and Communications (MOPC) approved a loan for more than $183 million for road infrastructure projects. The OPEC Fund for International Development (OFID) will provide just over $43 million, while Fonplata, a multilateral fund set up by Argentina, Bolivia, Brazil, Paraguay and Uruguay, will contribute with $140 million. The resources will be aimed to the south-west integration corridor road scheme, known as Corredores de Integracion Sur-Oeste.

MOPC is also waiting for National Congress authorisation to execute the three projects financed by Fonplata -- Puerto Pilar bypass, refurbishment of Alberdi-Pilar road stretch and the renovation of Remanso-Falcon section.

Related Content

  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
  • Bolivia’s latest highway project is underway
    May 29, 2018
    Bolivia’s new highway project will improve connections with Brazil and Chile – Mauro Nogarin reports. Work is underway on Bolivia’s new Rurrenabaque – Riberalta highway project, which will boost connectivity for the country. The project is being coordinated by the Bolivian Highway Administration (ABC), with an Eximbank loan of US$579.4 million providing the financing for 85% of the work. The remaining 15% of the funding will come from the Beni Department’s budget, where the route is being built. Located in
  • Colombia appoints EDL for feasibility of Conexion Pacifico-Orinoquia
    February 19, 2016
    Colombia's National Road Institute (Invias) has reported that engineering firm Enrique Davila Lozano (EDL) is carrying out the second phase of feasibility studies and designs for construction of the Conexion Pacifico-Orinoquia road. The highway will link the Valle del Cauca department with the Orinoquia region. Consortium Consorcio SMA-TEC 4 is compiling the inventory during the second phase. Conexion Pacifico-Orinoquia will pass through Meta, Vichada, Guaviare, Casanare, Tolima, and Huila. The
  • Delays for new bridge linking Brazil and Paraguay
    June 4, 2014
    Construction work on a new bridge connecting Brazil and Paraguay has suffered a further delay. The 760m suspension bridge itself is expected to cost in the order of US$102 million while the building of link roads and customs/immigration facilities bring the project total to some $170 million, according to a report by Business News Americas. Contractor Empresa Sul Americana de Montagens (EMSA) was originally thought to be the front runner for the project following its lowest cost bid of $101.78 million for t