Skip to main content

Five consortia line up for Denmark’s new Storstrøm Bridge project

The Danish government has shortlisted five consortia for construction of a new Storstrøm Bridge to replace an aging structure. The cost of the bridge connecting the Danish islands of Zealand and Falstser amounts to nearly €563 million (US$625.7 million) and the bridge will be financed by the government's Infrastructure Fund. Companies that qualified for the project are a joint venture consisting of Vinci Construction Grand ProjectsSAS, Hochtief Infrastructure GmbH and MT Højgaard; the consortium of St
June 18, 2015 Read time: 3 mins
The 1035 Danish government has shortlisted five consortia for construction of a new Storstrøm Bridge to replace an aging structure.

The cost of the bridge connecting the Danish islands of Zealand and Falstser amounts to nearly €563 million (US$625.7 million) and the bridge will be financed by the government's Infrastructure Fund.

Companies that qualified for the project are a joint venture consisting of 3085 Vinci Construction Grand ProjectsSAS, 981 Hochtief Infrastructure GmbH and MT Højgaard; the consortium of Strostrømsbroen Contractors, per Aarsleff, Ed. Züblin AG; the consortium of 975 Rizzani de Eccher, N.V. 1303 Besix S.A. 976 Acciona Infraestucturas; the joint venture Obrascon Huarte Lain, 3093 SK Engineering & Construction; and the joint venture Itinera s.p.a., 3481 Condotte s.p.a., Grandi Laovri Fincosit s.p.a.

The estimated cost of the project includes demolishing the old bridge, is expected to open by 2021, according to a report in the Danish business newspaper Berlingske.

Storstrom Bridge, along with its sister bridge the Kalvø Strøm, were opened in 1985 to ease traffic on an even older Storstrøm Bridge, a 3.2km road and rail arched crossing built in 1937. The newer Storstrom Bridge and Kalvo Strom Bridge are together known as the Faro Bridges because they touch down on the small island of Faro between Zealand and Falstser islands.

The newer high (south) Storstrom bridge is a 1.8km cable-stayed structures across the Storstrømmen straight between Falster and Farø islands. The longest span is nearly 300m and the maximum clearance to the sea is 26m. There is only one row of suspension cables, along the centre of the roadway.

The low (north) Kalvø Strøm bridge is a 1.6km bean structure crossing Kalvø Strøm straight between Farø and Zealand islands. The longest span is 40m and the maximum clearance to the sea is 20m.

When the new Storstrom Bridge was announced in mid-November 2012, the Danish Government was keen finance the project from unused funds destined for the country’s railway network. However, a number of opposition parties wanted to finance the bridge with revenue from the planned Fehmarn Belt link between Denmark and Germany, which is only now starting to be built, as World Highways reported in January.

The $7.5 billion Fehmarn Belt project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

For more information on companies in this article

Related Content

  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
  • BESIX wins Moelv-Roterud bridge design
    September 15, 2020
    The project includes a 1km main bridge over Norway’s Lake Mjøsa.
  • Fehmarn start for Germany
    December 8, 2021
    The Fehmarn Belt Fixed Link will cut journey times between Copenhagen and Hamburg.
  • Zealand to gain from Fehmarn Belt tunnel
    July 2, 2021
    The number of commuters crossing the Fehmarn Belt, a Baltic Sea strait that separates a German island and a Danish island, could reach 1.2 million by 2030, notes a new report.