Skip to main content

Five consortia line up for Denmark’s new Storstrøm Bridge project

The Danish government has shortlisted five consortia for construction of a new Storstrøm Bridge to replace an aging structure. The cost of the bridge connecting the Danish islands of Zealand and Falstser amounts to nearly €563 million (US$625.7 million) and the bridge will be financed by the government's Infrastructure Fund. Companies that qualified for the project are a joint venture consisting of Vinci Construction Grand ProjectsSAS, Hochtief Infrastructure GmbH and MT Højgaard; the consortium of St
June 18, 2015 Read time: 3 mins
The 1035 Danish government has shortlisted five consortia for construction of a new Storstrøm Bridge to replace an aging structure.

The cost of the bridge connecting the Danish islands of Zealand and Falstser amounts to nearly €563 million (US$625.7 million) and the bridge will be financed by the government's Infrastructure Fund.

Companies that qualified for the project are a joint venture consisting of 3085 Vinci Construction Grand ProjectsSAS, 981 Hochtief Infrastructure GmbH and MT Højgaard; the consortium of Strostrømsbroen Contractors, per Aarsleff, Ed. Züblin AG; the consortium of 975 Rizzani de Eccher, N.V. 1303 Besix S.A. 976 Acciona Infraestucturas; the joint venture Obrascon Huarte Lain, 3093 SK Engineering & Construction; and the joint venture Itinera s.p.a., 3481 Condotte s.p.a., Grandi Laovri Fincosit s.p.a.

The estimated cost of the project includes demolishing the old bridge, is expected to open by 2021, according to a report in the Danish business newspaper Berlingske.

Storstrom Bridge, along with its sister bridge the Kalvø Strøm, were opened in 1985 to ease traffic on an even older Storstrøm Bridge, a 3.2km road and rail arched crossing built in 1937. The newer Storstrom Bridge and Kalvo Strom Bridge are together known as the Faro Bridges because they touch down on the small island of Faro between Zealand and Falstser islands.

The newer high (south) Storstrom bridge is a 1.8km cable-stayed structures across the Storstrømmen straight between Falster and Farø islands. The longest span is nearly 300m and the maximum clearance to the sea is 26m. There is only one row of suspension cables, along the centre of the roadway.

The low (north) Kalvø Strøm bridge is a 1.6km bean structure crossing Kalvø Strøm straight between Farø and Zealand islands. The longest span is 40m and the maximum clearance to the sea is 20m.

When the new Storstrom Bridge was announced in mid-November 2012, the Danish Government was keen finance the project from unused funds destined for the country’s railway network. However, a number of opposition parties wanted to finance the bridge with revenue from the planned Fehmarn Belt link between Denmark and Germany, which is only now starting to be built, as World Highways reported in January.

The $7.5 billion Fehmarn Belt project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

For more information on companies in this article

Related Content

  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.
  • Denmark: construction of Storstrøm Bridge officially gets underway
    September 27, 2018
    Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
  • Major new bridge link discussed for Denmark
    November 16, 2012
    Discussions are in hand in Denmark over the proposed project to build a new bridge over Storstrøm that would link the islands of Zealand and Falster. While there is agreement that the bridge would prove beneficial to the islanders, the source of financing for the project has proved rather more troublesome for Denmark’s political parties. While the Danish Government is keen to source the €523 million needed from unused funds for the country’s railway network, a number of opposition parties want to finance th
  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe