Skip to main content

Financial close reached on Ontario’s Highway 401 expansion

Financial close has been reached by the West Corridor Constructors consortium on the US$494.46 million Highway 401 Expansion project near Toronto, Canada. West Corridor Constructors consists of Canadian construction firm Aecon which holds 50%, US-based building products firm Amico, which holds 20%, and US-based infrastructure engineering firm Parson, which holds 30%. The Highway 401 Expansion is a redevelopment and widening project between Regional Road 25 in the towns of Milton and Credit River in th
May 2, 2019 Read time: 1 min
Financial close has been reached by the West Corridor Constructors consortium on the US$494.46 million Highway 401 Expansion project near Toronto, Canada.


West Corridor Constructors consists of Canadian construction firm Aecon which holds 50%, US-based building products firm Amico, which holds 20%, and US-based infrastructure engineering firm Parson, which holds 30%.

The Highway 401 Expansion is a redevelopment and widening project between Regional Road 25 in the towns of Milton and Credit River in the Mississauga area. It comprises two core collector systems of 12 lanes and two 10-lane segments, plus median high occupancy vehicle (HOV) lanes.

Work involves culvert replacements, bridge reconstruction and replacement, ecological restoration and drainage and utilities.

Construction is scheduled to start by the end of the year and take three years.

Related Content

  • Kenya moves ahead with double-decker road to address costly city traffic jams
    December 11, 2013
    New double deck roads could cut congestion in Kenyan capital Nairobi – Shem Oirere reports Arapid increase in urban population and diminishing land for infrastructure expansion has forced Kenya to devise ways of addressing the worsening human and vehicular traffic problems in its capital Nairobi. The country national highways agency recently announced progress in the planned construction of the country’s first double-decker highway.
  • Land costs push up the price tag of the Dhaka-Chittagong Expressway
    August 23, 2018
    Ballooning land acquisition costs are pushing up the cost of the proposed 217km Dhaka-Chittagong Expressway, according to media reports. Under the project, the highways directorate has already widened 190km of the two-lane highway to four-lanes and constructed three flyovers. The sources also said now the agency has estimated the cost for constructing the full 217km at nearly US$2.4 billion without land acquisition cost.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Signify to light up Massey Tunnel
    January 15, 2021
    The LED replacements in the Vancouver area tunnel are Lumec TunnelView, made by Signify.