Skip to main content

Financial close reached on Ontario’s Highway 401 expansion

Financial close has been reached by the West Corridor Constructors consortium on the US$494.46 million Highway 401 Expansion project near Toronto, Canada. West Corridor Constructors consists of Canadian construction firm Aecon which holds 50%, US-based building products firm Amico, which holds 20%, and US-based infrastructure engineering firm Parson, which holds 30%. The Highway 401 Expansion is a redevelopment and widening project between Regional Road 25 in the towns of Milton and Credit River in th
May 2, 2019 Read time: 1 min
Financial close has been reached by the West Corridor Constructors consortium on the US$494.46 million Highway 401 Expansion project near Toronto, Canada.


West Corridor Constructors consists of Canadian construction firm Aecon which holds 50%, US-based building products firm Amico, which holds 20%, and US-based infrastructure engineering firm Parson, which holds 30%.

The Highway 401 Expansion is a redevelopment and widening project between Regional Road 25 in the towns of Milton and Credit River in the Mississauga area. It comprises two core collector systems of 12 lanes and two 10-lane segments, plus median high occupancy vehicle (HOV) lanes.

Work involves culvert replacements, bridge reconstruction and replacement, ecological restoration and drainage and utilities.

Construction is scheduled to start by the end of the year and take three years.

Related Content

  • UK’s Mersey Gateway Project team invites final tenders
    February 26, 2013
    The team behind what is set to be one of the UK’s largest infrastructure initiatives in the next few years has invited final tenders from the three shortlisted bidders competing to deliver it. The Mersey Gateway Project bidders have been asked to submit their tenders on behalf of Halton Borough Council by 10 April 2013, and an announcement about the identity of the preferred bidder is due in June 2013. This will allow the team behind the North West England-based project to sign a contract and begin construc
  • First phase of Houston reversible HOV to HOT lanes completed
    April 19, 2012
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135k
  • Cold road reclamation in South Africa
    July 18, 2012
    Raubex Construction’s new Cat RM500 rotary mixer is proving its worth on a road reclamation work on a South African highway Part of an extensive motorway network some 185km long, South Africa’s ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system. The new road will provide major impetus to socio-economic growth in the country’s most populous and commercially active region. Being built in stages by the South African National Roads Authority (SANRAL), these r
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of