Skip to main content

Financial close reached for A9 Gaasperdammerweg motorway work

Financial close has been reached for expansion of the A9 motorway near Amsterdam in the Netherlands. BNG Bank, DZ BANK, ING, KBC, SMBC and Société Général have made available a short-term debt of US$174 million (€140 million) and half of the long-term debt of nearly $509 million (€410 million). The European Investment Bank will provide the other half of the long-term debt. Mott MacDonald is the lenders’ technical advisor to the consortium IXAS Zuid-Oost, which has the public-private contract to expand
November 25, 2014 Read time: 2 mins
Financial close has been reached for expansion of the A9 motorway near Amsterdam in the Netherlands.

BNG Bank, DZ BANK, ING, KBC, SMBC and Société Général have made available a short-term debt of US$174 million (€140 million) and half of the long-term debt of nearly $509 million (€410 million). The 1054 European Investment Bank will provide the other half of the long-term debt.

2579 Mott MacDonald is the lenders’ technical advisor to the consortium IXAS Zuid-Oost, which has the public-private contract to expand the A9 Gaasperdammerweg section.

The scheme, worth around $868 million (€700 million), will see reconstruction and expansion of the A9 motorway between the junctions of Holendrecht and Diemen followed by a 20-year deal to manage and maintain the infrastructure.

Work includes replacement of the bridge over the River Gaasp, relaying the surface of the motorway and constructing a 3km overground tunnet. Additional lanes will be added to improve traffic flow and accessibility of the Northern Randstad area.

Mott MacDonald provided due diligence and technical reports to support financial close and is now monitoring construction to help the project stay on schedule and within budget. Construction work is due to begin in the summer next year, with the tunnel open for traffic in 2020.

The IXAS Zuid-Oost consortium is a special purpose company created by Ballast Nedam, 6343 Fluor, 3i Infrastructure and 1271 Heijmans Capital, a joint venture between Heijmans and 3i Infrastructure.

Joost van Loon, Mott MacDonald’s project director, said the work builds on the comapany’s infrastructure experience in the Netherlands and Belgium.

Mott MacDonald is a global management, engineering and development consultancy with a turnover of around $1.9 billion. It has 180 offices in nearly 50 countries and projects in 140 countries. Contracts are in the sectors of transport, buildings, power, oil and gas, international development, urban development, industry, water, environment, education, health and communications.

For more information on companies in this article

Related Content

  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
  • Work is on track with the Sluiskill Tunnel in the Netherlands
    January 2, 2013
    Work is progressing well in the Province of Zeeland in the Netherlands to construct the new Sluiskill Tunnel. This project forms part of a plan to develop the region alongside the Ghent-Terneuzen canal. The tunnel project was commissioned by the BV Kanaalkruising Sluiskil (BV KKS), the Combinatie BAM-TBI (CBT), a consortium comprising BAM Civiel, Wayss & Freytag Ingenieurbau, Croon Elektrotechniek and Mobilis. Construction of the Sluiskil Tunnel under the canal commenced in early 2011 and the twin tubes eac