Skip to main content

Ferry operators sink the financing plan for Fehmarn Belt link

The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules. The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure. Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for tr
December 17, 2018 Read time: 3 mins
Fehmarn Belt financing: up in the air for undersea tunnel

The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules.

The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure.

Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for transportation.

Ferry operators Scandlines and Stena Line which provide services between Europe and the Scandinavian peninsula, argued in the European Court that the grant level to be given to whichever company operating the toll structure is based on unrealistically high traffic volume predictions.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. Ferries connects the islands in the region. Completion of the €8.7 billion project has been set for 2028. However, even before the European Court ruling, the project’s approval process had been bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface.

“We are satisfied with the ruling of the Court of Justice of the European Union. (…) Scandlines is not against a Fehmarn connection established with state aid. State aid may be necessary when completing such large-scale projects,” said Søren Poulsgaard Jensen, chief executive of Scandlines.

“However, we do expect correct procedure, which entails transparency and fair competition. The aid must therefore be accurately and realistically defined, and it must be based on consistent assumptions and safeguarded against abuse. It is decisive for us that the tunnel cannot use the state finances as its sees fit to impose taxpayer-financed price pressure when traffic volumes do not live up to the optimistic prognoses and the ferries appear competitive.”
 
The arguments are in line with Stena Line’s appeal which questioned the necessity of the aid, the duration of the aid and the undue distortion to the market by allowing the Fehmarn fixed link to dramatically reduce prices.

“In this case State aid has been granted illegally. That’s why we welcome the decision from the court to annul the aid granted by the Commission for the construction of the Fehmarn Belt connection,” said Claes Berglund, director public affairs and sustainability for Stena.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with 4782 Femern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

8721 COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, 3392 SWECO is handling the design for the dredging and reclamation work.
 
A second framework contract, for technical support services to Femern, is being carried out by ÅF-Hansen & Henneberg.

For more information on companies in this article

Related Content

  • Topcon expanding operations with acquisition
    February 21, 2018
    Topcon Corporation has acquired all the outstanding shares of ClearEdge3D for an undisclosed sum. This deal adds a technology leader in the engineering and construction software industry to Topcon’s portfolio. ClearEdge3D’s EdgeWise software is intended to speed as-built modeling workflows by utilising automated feature extraction algorithms and other patented technologies. Its Verity construction verification software compares laser scan point cloud data of recently completed construction work against
  • Wacker Neuson is reporting strong half year results
    August 6, 2019
    Wacker Neuson is reporting strong financial performance for the first half of 2019. The firm says that it continued on its growth path, with revenue climbing 15.2% compared with the same period in the previous year. Revenue hit €950.7 million compared with €825.1 million for the first half of 2019. “The first half of the year showed us once again that our solutions meet the needs of our customers,” explained Martin Lehner, CEO of Wacker Neuson SE. “We gained shares in numerous markets, driven largely by our
  • Success of toll road operators' conference
    July 12, 2012
    The 37th ASECAP Annual Study and Information Days held in Krakow, Poland, gathered some 300 road transport CEOs, experts and government decision-makers making the event "a huge success." Patrick Smith reports Toll road operators from across Europe have met to discuss the state of their businesses in the current economic climate and how to tackle it. Fabrizio Palenzona, the outgoing President of ASECAP (the European professional Association of Operators of Toll Road Infrastructures) and president of AISCAT (
  • Wacker Neuson sees business growth with strong results
    November 10, 2017
    The Wacker Neuson Group is reporting a strong third quarter performance for 2017. The company’s latest results reveal a marked increase in revenue and earnings and says it remains positive about the fourth quarter of 2017. Wacker Neuson says it expects its revenue and earnings forecast for the current fiscal year to come in at the higher end of previous forecasts. The Wacker Neuson Group reported revenue of € 378.7 million for the third quarter of 2017. This corresponds to an increase of 20% over the €315.