Skip to main content

Ferry operators sink the financing plan for Fehmarn Belt link

The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules. The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure. Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for tr
December 17, 2018 Read time: 3 mins
Fehmarn Belt financing: up in the air for undersea tunnel

The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules.

The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure.

Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for transportation.

Ferry operators Scandlines and Stena Line which provide services between Europe and the Scandinavian peninsula, argued in the European Court that the grant level to be given to whichever company operating the toll structure is based on unrealistically high traffic volume predictions.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. Ferries connects the islands in the region. Completion of the €8.7 billion project has been set for 2028. However, even before the European Court ruling, the project’s approval process had been bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface.

“We are satisfied with the ruling of the Court of Justice of the European Union. (…) Scandlines is not against a Fehmarn connection established with state aid. State aid may be necessary when completing such large-scale projects,” said Søren Poulsgaard Jensen, chief executive of Scandlines.

“However, we do expect correct procedure, which entails transparency and fair competition. The aid must therefore be accurately and realistically defined, and it must be based on consistent assumptions and safeguarded against abuse. It is decisive for us that the tunnel cannot use the state finances as its sees fit to impose taxpayer-financed price pressure when traffic volumes do not live up to the optimistic prognoses and the ferries appear competitive.”
 
The arguments are in line with Stena Line’s appeal which questioned the necessity of the aid, the duration of the aid and the undue distortion to the market by allowing the Fehmarn fixed link to dramatically reduce prices.

“In this case State aid has been granted illegally. That’s why we welcome the decision from the court to annul the aid granted by the Commission for the construction of the Fehmarn Belt connection,” said Claes Berglund, director public affairs and sustainability for Stena.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with 4782 Femern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

8721 COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, 3392 SWECO is handling the design for the dredging and reclamation work.
 
A second framework contract, for technical support services to Femern, is being carried out by ÅF-Hansen & Henneberg.

For more information on companies in this article

Related Content

  • Concrete paving developments boosting performance
    April 12, 2018
    Change is afoot at Miller Formless following its change of ownership, with investment in research and design a priority – Mike Woof writes Miller Formless is undergoing a process of change under its new ownership, with investment in the factory as well as in the product range. The recent tie-up between Guntert & Zimmerman and Miller Formless has brought additional global manufacturing capacity. Guntert & Zimmerman had established a manufacturing presence in India through an agreement with a local firm, a
  • Have your say about digitisation in the construction sector
    April 30, 2018
    What is the state of digitisation in the construction sector and - more importantly - where will it be in three to five years or more? Will the players, large and small, in the value chain simply react to new technologies or shape them to benefit the sector by improving efficiencies and products? Importantly, what and how much cooperation will be needed to drive innovation? Have your say about these issues facing businesses, governments and the supply chain. It takes little more than 10 minutes to fill
  • LeeBoy’s strong future, through Tier 4 Final investment
    February 22, 2019
    LeeBoy is seeing strong sales for its road machines at the moment, particularly in the US. And the firm’s early investment in fitting Tier 4 Final compliant engines has played a significant role Christopher Barnard is CEO of LeeBoy and commented, “The US has been strong. Demand is there and the infrastructure spending is there. It’s a good market. In our segment for commercial paving we’re doing very well.” The paver range is selling well and the firm’s 8520 model is a particularly strong seller. Barnard
  • LeeBoy’s strong future, through Tier 4 Final investment
    March 20, 2019
    LeeBoy is seeing strong sales for its road machines at the moment, particularly in the US. And the firm’s early investment in fitting Tier 4 Final compliant engines has played a significant role Christopher Barnard is CEO of LeeBoy and commented, “The US has been strong. Demand is there and the infrastructure spending is there. It’s a good market. In our segment for commercial paving we’re doing very well.” The paver range is selling well and the firm’s 8520 model is a particularly strong seller. Barnard