Skip to main content

Fehmarn Fixed Link project finally gets European Commission approval

EC settles the public financing issue for the Fehmarn project that includes an immersed tunnel.
By David Arminas March 31, 2020 Read time: 2 mins
Public financing settled for the Fehmarn Belt Fixed Link including the road and rail tunnel between Germany and Denmark (photo courtesy Femern A/S)

Public funds from the European Commission for the Fehmarn Belt tunnel between Germany and Denmark has been approved, but for less than hoped.

Danish authorities will provide €9.30 billion (US$10.7 billion) in state loans and guarantees for the first 16 years of operation, instead of €55 billion as initially decided.

The EC decision effectively gives the green light for the immersed road and rail tunnel, part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Completion of the €8.7 billion project had been set for 2028. However, the project’s approval process has been bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface.

Denmark is completely responsible for financing the project that will replace a ferry service. Ferry operators Scandlines and Stena Line which provide services between Europe and the Scandinavian peninsula, had been arguing that the grant level to be given to whichever company operating the toll structure is based on unrealistically high traffic volume predictions.

The Fehmarnbelt link will be user-financed. Revenues from the link will go to repay the loans that financed its construction; the same model that financed the Storebælt and Øresund links. Denmark’s Parliament will decide the tolls and the operator Femern says there likely will be discounts such as weekend tickets, as is the case on the Øresund and Storebælt links.

Meanwhile, due to the spread of the COVID-19 virus, organisers of the Fehmarnbelt Days 2020 festival conference have postponed the event that was to have taken place May 17. The Fehmarnbelt Days Secretariat said that an alternative date will be announced shortly. Since 2012 the Fehmarnbelt Days have dealt with key areas such as infrastructure, tourism, business, the labour market, transport and logistics as well as education and research.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Femern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, SWECO is handling the design for the dredging and reclamation work.
 
A second framework contract, for technical support services to Femern, is being carried out by ÅF-Hansen & Henneberg.

For more information on companies in this article

Related Content

  • Montenegro on the ropes over China deal
    April 13, 2021
    The first 41km of highway cost €20 million per kilometre - one of the most expensive highways in the world.
  • Bangladesh: Cost of Padma Bridge project rises
    January 11, 2016
    The cost of building the Padma Bridge in Bangladesh will be nearly three times the US$2.61 billion estimated in 2011. Also on the rise is the cost of flood prevention work in the form of levee construction – called river training in Bangladesh. The addition of 1.3km of work at the Mawa end of the bridge means the total cost is now $1.2 billion, up from $1.1 billion. Apart from $200 from the $1 billion loan from India the project is not using any foreign financing, according to a report in the Daily S
  • Trail blazing for the Gordie Howe Bridge
    February 23, 2024
    Gordie Howe International Bridge between Canada and the US will become the first international bridge to link national trail systems across the border.
  • LiuGong embraces Industry 4.0
    November 27, 2018
    LiuGong chairman Zeng Guang’an says that the firm is fully embracing Industry 4.0 technology. Coupled with ongoing machine development, an expanding global sales and manufacturing network and long-established strong relationships with customers and suppliers, this is enabling the Chinese construction equipment giant to target RMB 50 billion (US$7.18bn) operating revenue by 2025. Chairman Zeng outlined the impressive scale of LiuGong’s future ambitions during an impassioned speech in front of an audi