Skip to main content

Fehmarn Belt Fixed Link could open by 2025 at earliest

The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry. Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany. Of particular is the time for a construction company t
November 27, 2015 Read time: 3 mins
The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry.

4782 Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany.

Of particular is the time for a construction company to receive full payback for the project because of declining traffic volume forecasts.

Financing includes European Union subsidies amounting to nearly €590 million during 2016-2019, but with delays to start of construction subsidies may be cut back.

World Highways reported in October that a study by Danish consultant Hans Schjær-Jacobsen had shown that payback period for the proposed 17km tunnel would be close to 50 years. This is a decade longer than estimated by the developers of the project, the study noted.

The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The tunnel, incorporating two railway tunnels, two motorway tunnels and an emergency tunnel, will cross the Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

According to the study, driver fees alone are unlikely to be sufficient for the financing of the link. Danish taxpayers will likely have to contribute to the project. More research is needed to pinpoint the finer details of the project whose estimated cost has been rising over the past year.

The Fehmarn Belt immersed tunnel project was approved by the Danish parliament in April this year. It is supposed to be built, owned - apart from the German land works - and operated by a Danish state agency called Femern, a subsidiary of Sund & Bælt Holding, and financed by loans guaranteed by the Danish government.

World Highways also reported in February that the Danish government was talking to contractors over the latest rise, a jump of €1.2 billion, in cost estimates for entire project. Contractors estimated an extra €295.5 million will be needed.

This is in addition to a statement in November 2014 by the contracting company Femern saying that costs had risen nearly by €900 million.

For more information on companies in this article

Related Content

  • Construction work will start shortly on major Indonesian tollroad
    July 22, 2013
    In Indonesia the country’s government intends to speed up preparations for the massive Trans Sumatra tollroad project. This 2,700km highway link is costing close to US$30 billion and much of the work will be carried out by the state-owned contractor, Hutama Kaya. Construction will commence in late-September 2013 and the project is scheduled to be fully open by 2025. This highway will connect all 10 provinces in Sumatra Island through Aceh-Lampung. Phase one of the project is for the construction of four sec
  • DEUTZ year-end expectations hold firm despite volatile market
    August 10, 2016
    German engine manufacturer DEUTZ reported new orders in the group rose by 1% to €677.2 million (H1 2015: €670.7 million), despite tough market conditions. Orders in the second quarter of 2016 amounted to €349.9 million, which was 6.9 per cent higher than the figure of €327.3 million for the first quarter, and the same level as the second quarter of 2015 (€349.7 million). The number of engines sold fell to 69,705, down by almost 11% compared with the corresponding period of 2015 (H1 2015: 78,120 eng
  • Algeria gives go ahead for 63km Guelma-Annaba motorway
    December 11, 2014
    Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
  • Transpordiamet opens Tartu procurement
    May 20, 2021
    The Estonian Transport Administration - Transpordiamet - is tendering for the Tallinn–Tartu–Võru–Luhamaa highway section of the planned Western Tartu Bypass.