Skip to main content

FCC Corredor de las Playas wins Panama Inter-American Highway deal

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway. FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso. The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the
November 21, 2017 Read time: 2 mins
Artist impression of the Inter-American Highway between La Chorrera and Santa Cruz in Panama’s province of Panama Oeste.

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway.

FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso.

The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the bypasses around the towns of Capira and Campana.

The widened section will improve the connection with the end of the Arraiján-La Chorrera motorway and the new Pan-American Highway. Traffic volume over the section will be around 30,000 an hour.

Other projects for FCC Construcción in Latin America include construction of sections 1 and 2 of the Vía Brasil corridor and rehabilitated and enlarged the Arraiján-La Chorrera section of the Pan-American Highway.

In Mexico, FCC built the 850m-long San Marcos Viaduct as part of Mexico’s Nuevo Necaxa motorway project. FCC’s work on the 36km Nuevo Necaxa-Ávila Camacho section including the viaduct was done in a joint venture with the Mexican company ICA

Related Content

  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Simex machine helps deliver new tunnel lining
    December 1, 2014
    In Italy an MP1000 cutting system from Simex has been used to help resurface the walls of a highway tunnel. The SS51 State Road crosses through the Dolomites in the north-eastern Alpine Region of Italy. The SS51 starts in San Vendemiano in the province of Treviso and ends in Dobbiaco in the province of Bolzano and is a key road because it connects Cadore and the main towns in the area of Cortina d'Ampezzo. This 134.4 km road has expansion work and upgrades to improve safety and boost capacity. One the mo
  • Simex machine helps deliver new tunnel lining
    December 3, 2014
    In Italy an MP1000 cutting system from Simex has been used to help resurface the walls of a highway tunnel. The SS51 State Road crosses through the Dolomites in the north-eastern Alpine Region of Italy. The SS51 starts in San Vendemiano in the province of Treviso and ends in Dobbiaco in the province of Bolzano and is a key road because it connects Cadore and the main towns in the area of Cortina d'Ampezzo. This 134.4 km road has expansion work and upgrades to improve safety and boost capacity.
  • Tunnel construction at Mexican extraction operation
    April 16, 2018
    The innovative Carmix 3500 TC unit is now being put to work at the Concheño underground extraction operation in Mexico This operation in the state of Chihuahua was opened in 2013 and can produce 15000tonnes/day. In this context, Minera Real de Angeles opted for four Carmix 3500 TC machines for the construction of access roads. The machine is said to be both versatile and productive, while its comparatively compact dimensions are well suited to underground use. The unit was supplied to the customer by Car