Skip to main content

FCC Corredor de las Playas wins Panama Inter-American Highway deal

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway. FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso. The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the
November 21, 2017 Read time: 2 mins
Artist impression of the Inter-American Highway between La Chorrera and Santa Cruz in Panama’s province of Panama Oeste.

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway.

FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso.

The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the bypasses around the towns of Capira and Campana.

The widened section will improve the connection with the end of the Arraiján-La Chorrera motorway and the new Pan-American Highway. Traffic volume over the section will be around 30,000 an hour.

Other projects for FCC Construcción in Latin America include construction of sections 1 and 2 of the Vía Brasil corridor and rehabilitated and enlarged the Arraiján-La Chorrera section of the Pan-American Highway.

In Mexico, FCC built the 850m-long San Marcos Viaduct as part of Mexico’s Nuevo Necaxa motorway project. FCC’s work on the 36km Nuevo Necaxa-Ávila Camacho section including the viaduct was done in a joint venture with the Mexican company ICA

Related Content

  • Bolivia dual carriageway project stalled
    September 12, 2016
    Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Mexico's new RCC concrete road
    November 9, 2017
    CEMEX is supplying a special grade of concrete for use on a busy logistics centre in Mexico. The order has been for 21,500m3 of roller compacted concrete (RCC) to pave all of the roads for the new terminal of ALA Transportes, a division of Grupo Transportes de Monterrey (GTM) - the largest trucking company in Mexico. The trucking firm needed a tough and durable concrete grade to be able to cope with the loads exerted by the movements of around 400 heavily laden trailers/day at the facility.
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru