Skip to main content

EU launches investigation into Fehmarn Belt financing model

The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
June 21, 2019 Read time: 2 mins

The 2465 European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules.

The announcement follows the 1116 European Union General Court's annulment of a previous Commission decision approving the support.

"Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.

This financing model is likely to see European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the 1035 Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

The fixed immersed tunnel 18km link across the Fehmarnbelt will carry a four-lane motorway alongside a twin track-electrified railway. It will be more than five times the length of the tunnel under Øresund linking Denmark and Sweden and more than three times the length of the record-holding Trans-Bay Tube Bart Tunnel in San Francisco in the 972 US state of California.

Vehicle passage through the tunnel at 110kph is expected to take around 10 minutes. Duration of the train journey between Hamburg in northern Germany and the Danish capital  Copenhagen will be cut from about four and a half hours to three, according to engineering consultant 6801 Ramboll which is collaborating with 8624 Tunnel Engineering Consultants (TEC) og 1419 Arup. 6801 Ramboll is advising Fehmarn on the design of the immersed tunnel solution.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • Rema Tip Top conveys new products
    April 9, 2013
    Rema Tip Top, focussing on service know-how, has further extended its comprehensive portfolio of industrial applications and now offers both the design and production of Remawell sidewall conveyor belts. These special conveyor belts, constructed from the components (basic belt, sidewalls and cleats) permit the transport of all kinds of bulk material. The three components taken together give a defined transport volume that is constant even if the conveyor routing is vertical or skewed, thus ensuring a consta
  • A new 50tonne class excavator from Hidromek is its biggest yet
    February 6, 2013
    Hidromek is offering an improved excavator series and plans to introduce a new top-of-the-range machine later this year. Export manager Anil Bingöl said, “We are preparing a 50tonne class machine.” He added that this will be offered with a Tier 4 Interim/Stage IIIB emissions rating only, although full specifications of the machine have yet to be revealed. The new 50tonne class excavator will benefit from the latest Hidromek telematics package, which uses satellite communications to provide a continuous flow
  • DAT’s speedy and reliable dataloggers
    January 6, 2017
    DAT instruments is a leading manufacturer of dataloggers for geotechnical activities and special foundations. The company, whose dataloggers are suitable for use in applications relating to jet grouting; grouting; cement injection; drilling; MWD; CFA; soil mixing; vibroflotation; diaphragm walls; Lugeon tests; and mineral investigation. Product reliability and company service are said to be among DAT instruments key priorities.
  • DAT’s speedy and reliable dataloggers
    March 27, 2013
    DAT instruments is a leading manufacturer of dataloggers for geotechnical activities and special foundations. The company, whose dataloggers are suitable for use in applications relating to jet grouting; grouting; cement injection; drilling; MWD; CFA; soil mixing; vibroflotation; diaphragm walls; Lugeon tests; and mineral investigation. Product reliability and company service are said to be among DAT instruments key priorities.