Skip to main content

EU launches investigation into Fehmarn Belt financing model

The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
June 21, 2019 Read time: 2 mins

The 2465 European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules.

The announcement follows the 1116 European Union General Court's annulment of a previous Commission decision approving the support.

"Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.

This financing model is likely to see European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the 1035 Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

The fixed immersed tunnel 18km link across the Fehmarnbelt will carry a four-lane motorway alongside a twin track-electrified railway. It will be more than five times the length of the tunnel under Øresund linking Denmark and Sweden and more than three times the length of the record-holding Trans-Bay Tube Bart Tunnel in San Francisco in the 972 US state of California.

Vehicle passage through the tunnel at 110kph is expected to take around 10 minutes. Duration of the train journey between Hamburg in northern Germany and the Danish capital  Copenhagen will be cut from about four and a half hours to three, according to engineering consultant 6801 Ramboll which is collaborating with 8624 Tunnel Engineering Consultants (TEC) og 1419 Arup. 6801 Ramboll is advising Fehmarn on the design of the immersed tunnel solution.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • Sweden awards Smartroad Gotland and Electreon a test road in Visby
    April 17, 2019
    Swedish inductive road consortium Smartroad Gotland has won a contract to convert 1.6km of road around Visby into an electric vehicle demonstration bed. The award by Sweden’s government transport administration agency Trafikverket covers a route used by buses and is also popular with logistics vehicle drivers between Visby Airport and central Visby. The former Hanseatic city, with a population around 25,000, is on the island of Gotland and has been a UNESCO World Heritage Site since 1995. Visby joins
  • VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike
    October 17, 2016
    Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

    As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.
  • New machines and a new division for Controls Group
    January 6, 2017
    Controls Group launched the Automax range of testing machines at bauma 2013.
  • Manitowoc increases its dealer service back-up
    January 6, 2017
    Manitowoc Crane Care is expanding its EnCORE dealer programme. Danish company UN Mobilkraner, which has worked with Manitowoc since 1994, now offers certified repair and refurbishment services for Grove mobile cranes in Scandinavia, under the Manitowoc Crane Care brand. To qualify for the program, dealers must invest considerable time in training technical staff, including advanced training for welders to earn the correct certifications for welding structural components on cranes.