Skip to main content

EU launches investigation into Fehmarn Belt financing model

The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
June 21, 2019 Read time: 2 mins

The 2465 European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules.

The announcement follows the 1116 European Union General Court's annulment of a previous Commission decision approving the support.

"Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.

This financing model is likely to see European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the 1035 Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

The fixed immersed tunnel 18km link across the Fehmarnbelt will carry a four-lane motorway alongside a twin track-electrified railway. It will be more than five times the length of the tunnel under Øresund linking Denmark and Sweden and more than three times the length of the record-holding Trans-Bay Tube Bart Tunnel in San Francisco in the 972 US state of California.

Vehicle passage through the tunnel at 110kph is expected to take around 10 minutes. Duration of the train journey between Hamburg in northern Germany and the Danish capital  Copenhagen will be cut from about four and a half hours to three, according to engineering consultant 6801 Ramboll which is collaborating with 8624 Tunnel Engineering Consultants (TEC) og 1419 Arup. 6801 Ramboll is advising Fehmarn on the design of the immersed tunnel solution.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • Norway moves toward more E39 coastal road improvements
    April 4, 2019
    Norway is working on plans to make more of the major north-south E39 coastal route a ferry-free highway, coasting €35.3 billion, according to media. In Norway, the trans-European route 39 is part national road system and is developed and maintained by the public roads administration. It runs for 1,330km along the coast from Klett just south of Trondheim to Nørresundby. Norway’s E39 is mostly a two-lane undivided road with only relatively short sections near Stavanger, Trondheim and Bergen being motorw
  • Volvo CE’s earthmovers on film for promotion campaign
    October 25, 2018
    For its new publicity campaign, Volvo Construction Equipment has teamed up with film star hardman Dolph Lundgren to showcase its excavators’ endurance in a stunt-filled mini-movie entitled Pump It Up. In the tongue-in-cheek mini-movie Lundgren, whose credits include Rocky IV, Universal Soldier and The Expendables, plays an all-action drill instructor in an excavator boot camp determined to test the diggers to their limits. Excavators ranging from 1.5t to 95t are ordered to do press-ups, pull-ups, flip
  • HxGN Live 2014: Hexagon CEO highlights individual need to grasp IT innovation
    June 4, 2014
    Hexagon president and CEO Ola Rollén stressed how individual users of exciting information technology innovation held the key to successfully confronting growing global challenges during his keynote speech titled ‘The Disruptive Power of Transformation’ which officially opened HxGN Live 2014.
  • Deadline for submitting European Transport Conference 2014 abstracts
    February 3, 2014
    Tomorrow is the deadline for submitting abstracts to the European Transport Conference (ETC) 2014. The ETC connects the worlds of research, consultancy, policy and practice. Attendance at ETC allows different groups to pose questions to fellow professionals and to assess what is possible in terms of delivery. Researchers are challenged by policy-makers; practitioners need to deliver on the ground what the policy-makers want. The Association for European Transport has identified for the 2014 Conference so