Skip to main content

EU launches investigation into Fehmarn Belt financing model

The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
June 21, 2019 Read time: 2 mins

The 2465 European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules.

The announcement follows the 1116 European Union General Court's annulment of a previous Commission decision approving the support.

"Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.

This financing model is likely to see European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the 1035 Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

The fixed immersed tunnel 18km link across the Fehmarnbelt will carry a four-lane motorway alongside a twin track-electrified railway. It will be more than five times the length of the tunnel under Øresund linking Denmark and Sweden and more than three times the length of the record-holding Trans-Bay Tube Bart Tunnel in San Francisco in the 972 US state of California.

Vehicle passage through the tunnel at 110kph is expected to take around 10 minutes. Duration of the train journey between Hamburg in northern Germany and the Danish capital  Copenhagen will be cut from about four and a half hours to three, according to engineering consultant 6801 Ramboll which is collaborating with 8624 Tunnel Engineering Consultants (TEC) og 1419 Arup. 6801 Ramboll is advising Fehmarn on the design of the immersed tunnel solution.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Poland: Budimex picks up S3 express road work near Lubin
    December 18, 2014
    The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
  • Damaged Norwegian bridge undergoes successful demolition
    February 23, 2015
    A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to