Skip to main content

Ethiopia announces three road projects worth over $240 million

In Ethiopia, three road projects worth over US$240 million will be built as part of the country's fourth road sector development plan. The government will fund the projects using its own resources. The first project is the 83km Sodo-Tercha asphalt-concrete project, costing around $84 million and to be built by China Railway Seventh Group. Completion is scheduled for 19 months. The second project, worth $102 million is the 99km Bilbela-Sekota road project, scheduled to take 39 months and to be built
April 17, 2015 Read time: 2 mins
In Ethiopia, three road projects worth over US$240 million will be built as part of the country's fourth road sector development plan.

The government will fund the projects using its own resources.

The first project is the 83km Sodo-Tercha asphalt-concrete project, costing around $84 million and to be built by China Railway Seventh Group. Completion is scheduled for 19 months.

The second project, worth $102 million is the 99km Bilbela-Sekota road project, scheduled to take 39 months and to be built by China First Highway Engineering Company.

Local firm Ethiopian business Defense Construction Enterprise will build the third project, the 80km Dichito-Gaielfi roundabout-Beleho works. The project will comprise 17km of standard asphalt road with the rest, 63km or more, as concrete rigid pavement. The project is due for completion in 1,170 days.

Ethiopia laid out an ambitious road strategy in 2012 A 10-year $2.4 billion development plan was created to ensure the country gets some business from the opening up of the East Africa commodity market. Better roads allow more access to foreign investment for the landlocked country. The goal has been to continue a 6%-plus annual economic growth rate or improved upon.

World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2245 0 oLinkExternal reported in May 2012 Visit WH article published in May 2012 false /sections/emergent/features/ethiopia-races-on-with-projects/ false false%> that the AfDB bank had announced a $234.5 million loan for two roads - the 112km Bedele-Metu highway and the 197km Hawassa-Ageremariam - that will see the country access ports in neighbouring Sudan and Kenya.

Related Content

  • CEI enters concrete plant market
    January 6, 2017
    CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies.
  • CEI enters concrete plant market
    January 29, 2014
    CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies.
  • Faresin shows upgraded telehandlers
    January 6, 2017
    Faresin Industries has expanded its telescopic handler range with the addition of the FH8.40 and the rotating Storm 22.45 evo. The FH8.40 sits in the range between the established FH7.45 and the FH9.30. The machine has a capacity of 4tonnes with a maximum lift height of 8m. Higher up the lifting scale, the Storm 22.45 rotating handler can manage up to 45tonne lifts, with a maximum height of 22m.
  • Faresin shows upgraded telehandlers
    April 19, 2013
    Faresin Industries has expanded its telescopic handler range with the addition of the FH8.40 and the rotating Storm 22.45 evo. The FH8.40 sits in the range between the established FH7.45 and the FH9.30. The machine has a capacity of 4tonnes with a maximum lift height of 8m. Higher up the lifting scale, the Storm 22.45 rotating handler can manage up to 45tonne lifts, with a maximum height of 22m.