Skip to main content

Ethiopia announces three road projects worth over $240 million

In Ethiopia, three road projects worth over US$240 million will be built as part of the country's fourth road sector development plan. The government will fund the projects using its own resources. The first project is the 83km Sodo-Tercha asphalt-concrete project, costing around $84 million and to be built by China Railway Seventh Group. Completion is scheduled for 19 months. The second project, worth $102 million is the 99km Bilbela-Sekota road project, scheduled to take 39 months and to be built
April 17, 2015 Read time: 2 mins
In Ethiopia, three road projects worth over US$240 million will be built as part of the country's fourth road sector development plan.

The government will fund the projects using its own resources.

The first project is the 83km Sodo-Tercha asphalt-concrete project, costing around $84 million and to be built by China Railway Seventh Group. Completion is scheduled for 19 months.

The second project, worth $102 million is the 99km Bilbela-Sekota road project, scheduled to take 39 months and to be built by China First Highway Engineering Company.

Local firm Ethiopian business Defense Construction Enterprise will build the third project, the 80km Dichito-Gaielfi roundabout-Beleho works. The project will comprise 17km of standard asphalt road with the rest, 63km or more, as concrete rigid pavement. The project is due for completion in 1,170 days.

Ethiopia laid out an ambitious road strategy in 2012 A 10-year $2.4 billion development plan was created to ensure the country gets some business from the opening up of the East Africa commodity market. Better roads allow more access to foreign investment for the landlocked country. The goal has been to continue a 6%-plus annual economic growth rate or improved upon.

World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2245 0 oLinkExternal reported in May 2012 Visit WH article published in May 2012 false /sections/emergent/features/ethiopia-races-on-with-projects/ false false%> that the AfDB bank had announced a $234.5 million loan for two roads - the 112km Bedele-Metu highway and the 197km Hawassa-Ageremariam - that will see the country access ports in neighbouring Sudan and Kenya.

Related Content

  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent
  • Serbia in talks with Shandong Hi-Speed and China Road and Bridge
    October 22, 2014
    Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf
  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    January 6, 2017
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    April 19, 2012
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.