Skip to main content

Ethiopia announces three road projects worth over $240 million

In Ethiopia, three road projects worth over US$240 million will be built as part of the country's fourth road sector development plan. The government will fund the projects using its own resources. The first project is the 83km Sodo-Tercha asphalt-concrete project, costing around $84 million and to be built by China Railway Seventh Group. Completion is scheduled for 19 months. The second project, worth $102 million is the 99km Bilbela-Sekota road project, scheduled to take 39 months and to be built
April 17, 2015 Read time: 2 mins
In Ethiopia, three road projects worth over US$240 million will be built as part of the country's fourth road sector development plan.

The government will fund the projects using its own resources.

The first project is the 83km Sodo-Tercha asphalt-concrete project, costing around $84 million and to be built by China Railway Seventh Group. Completion is scheduled for 19 months.

The second project, worth $102 million is the 99km Bilbela-Sekota road project, scheduled to take 39 months and to be built by China First Highway Engineering Company.

Local firm Ethiopian business Defense Construction Enterprise will build the third project, the 80km Dichito-Gaielfi roundabout-Beleho works. The project will comprise 17km of standard asphalt road with the rest, 63km or more, as concrete rigid pavement. The project is due for completion in 1,170 days.

Ethiopia laid out an ambitious road strategy in 2012 A 10-year $2.4 billion development plan was created to ensure the country gets some business from the opening up of the East Africa commodity market. Better roads allow more access to foreign investment for the landlocked country. The goal has been to continue a 6%-plus annual economic growth rate or improved upon.

World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2245 0 oLinkExternal reported in May 2012 Visit WH article published in May 2012 false /sections/emergent/features/ethiopia-races-on-with-projects/ false false%> that the AfDB bank had announced a $234.5 million loan for two roads - the 112km Bedele-Metu highway and the 197km Hawassa-Ageremariam - that will see the country access ports in neighbouring Sudan and Kenya.

Related Content

  • International Transport Forum: public vs private policy debate
    December 4, 2014
    Simply banning cars in parts of major cities will not necessarily greatly improve the air quality over time, a new report has found. The answer for cutting carbon emissions is to get the right balance of private and public transportation along with infrastructure developed to sustain the mix, according to the International Transport Forum (ITF), a think tank within the Organisation of Economic Cooperation and Development (OECD). The ITF evaluated the potential impact of transport policies on urban carbon
  • Topcon and DynaRoad announce major software upgrade
    January 6, 2017
    Topcon Positioning Group and DynaRoad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

 Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.” DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of eart
  • Topcon and DynaRoad announce major software upgrade
    April 18, 2013
    Topcon Positioning Group and DynaRoad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

 Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.” DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of eart
  • Liebherr adds TA240 to ADT line-up
    January 6, 2017
    Liebherr has added a second model to its articulated hauler range with the TA240. The 40 tonne capacity truck has a 27m3 body and a 6x6 driveline. Power comes from a 16.2 litre Stage IIIB Liebherr V8 diesel engine delivering 350kW (476hp). This enables the truck to reach maximum speeds of up to 57km/h. A high performance retarder helps to bring the truck to a halt and can be preselected, with both the engine brake and the retarder working as soon as the driver lifts their foot from the throttle pedal. Wet,