Skip to main content

Eiffage set to be concessionaire for France’s RCEA project

France’s Transport Ministry has chosen construction and concessions group Eiffage as the single prospective concessionaire for the project to complete the Route Centre-Europe Atlantique. The east-west RCEA is considered to be one of the most dangerous routes in France, according to government statistics. Some sections of the route, also called the Route Nationale 79, has been upgraded into a four-lane motorway over the past several decades. The plan is make the remaining two-lane sections into four-lanes
June 17, 2019 Read time: 2 mins
France’s Transport Ministry has chosen construction and concessions group 5871 Eiffage as the single prospective concessionaire for the project to complete the Route Centre-Europe Atlantique.


The east-west RCEA is considered to be one of the most dangerous routes in France, according to government statistics. Some sections of the route, also called the Route Nationale 79, has been upgraded into a four-lane motorway over the past several decades. The plan is make the remaining two-lane sections into four-lanes.

French media reported that negotiations will now begin to finalise the project that could cost as much as €600 million, according to an estimate made last year by Benoît de Ruffray, chief executive of Eiffage.

The concession – which will not be bolstered with any public money – must include the provision for  clean vehicles and the deployment of electric vehicle charging equipment.

The project must be finalised by France’s transport regulator ARAFER and then given the go-ahead by the State Council, likely by the end of the year.

For more information on companies in this article

Related Content

  • China looks to the future with major highway plans
    February 15, 2012
    China is still moving ahead with plans that will give it the world's biggest highway system. Patrick Smith reports. As China's economy grows even more, keeping the country on the move has become a priority for the government. While the country has made great strides over the past decade in improving its infrastructure, the number of vehicles has also increased rapidly, and in some instances restrictions have been placed on them.
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Zipping up road lanes
    September 28, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra